01
Closeout is an owned action, not a ticked box.
Any failed item becomes an owned corrective action with a due date and severity, closed only after verification, adding the follow-up layer that ends where a GoAudits report stops.
- Actions are created from the failed item, with the evidence attached
- Fixes are verified by photo or re-inspection before closing
- AI helps spot and mark up issues; people make the call
Start from a template: Site Inspection Checklist


