
Take a Photo. AI Fills the Form
Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically. No typing. No manual entry.
SCADA Compliance App gives SCADA compliance a defensible audit trail. Every check is timestamped, photo-backed, and aligned to IEC 62443 and ISA-95, so an auditor sees proof in seconds instead of days. Managers see live SCADA compliance status and upcoming statutory due dates across every site.

SCADA Compliance App evidences SCADA compliance check covering RTU and PLC status, communications and redundancy, alarms and setpoints, data logging and historian, and access control and cybersecurity, with a photo and a sign-off required on each point. Without a system, SCADA findings live on paper and in chat. A SCADA fault such as rtu or plc fault slips through. An audit then means rebuilding SCADA evidence from folders.
SCADA Compliance App keeps one record per SCADA and per site, with photo evidence and a named sign-off. Each SCADA finding is tracked to verified closure. Control and automation teams see SCADA completion and overdue actions across the facilities management portfolio. Every SCADA record proves what was checked, when, and by whom.
A comprehensive SCADA inspection covers the key areas that affect operations and compliance. Track SCADA compliance with statutory tests, alarm logs, and AMC records per site. Your inspection should include sections for RTU and PLC status, communications and redundancy, and alarms and setpoints, evidence capture, pass/fail or scoring criteria, corrective action assignment, and sign-off, so that nothing is missed and every inspection finding is traceable.
Compliance evidence is only useful if it is complete and retrievable. Follow these steps for each compliance check:
SCADA compliance evidences the required checks on RTU and PLC status, communications and redundancy, alarms and setpoints, data logging and historian, and access control and cybersecurity. The photos and readings each SCADA rule expects are mandatory fields. SCADA renewals are flagged before they lapse. So SCADA compliance stays a documented fact, not an assurance.
Templates align to IEC 62443, ISA-95.

The SCADA template is aligned to IEC 62443 and ISA-95.

Every SCADA check carries photo evidence, a timestamp, and identity.

Audit-ready SCADA PDFs export in seconds when an auditor asks.
Everything your field team records during SCADA compliance, from photos and voice notes to sign-off, InspectWrk turns into a finished report automatically. Faster, more accurate, and without the retyping.

Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically. No typing. No manual entry.

Inspectors speak their observations in any language. AI transcribes and fills the form in real time. Completely hands-free in the field.

The moment an inspection is submitted, a branded PDF, Excel, or CSV report generates automatically. No manual work. No waiting.

InspectWrk integrates with the tools your team already uses, including Zoho, Microsoft 365, and SAP. No double entry.

Your operations team sees completion rates, open issues, and compliance scores across all sites in real time. No chasing updates.
From data collection to compliance: see how teams use InspectWrk for every use case.
Capture field data once with digital forms that work even offline.
Explore use caseRun standardized inspections with photos, scoring, and instant reports.
Explore use caseConduct structured audits with evidence trails and pass or fail scoring.
Explore use caseLog hazards, near misses, and safety checks from any job site.
Explore use caseCatch defects early with repeatable quality checks and sign off.
Explore use caseReport incidents in the moment with photos and follow up actions.
Explore use caseInspect assets and keep condition and inspection history per asset.
Explore use caseRun preventive maintenance checks and log repairs with photo evidence.
Explore use caseStay audit ready with logged checks, timestamps, and shareable reports.
Explore use caseSCADA work breaks down the moment evidence leaves the form. These are the problems SCADA Compliance App is built to remove, and what the team gets back when it does.

A defect on the SCADA is handed to assigned contractor. A week later the SCADA defect is marked closed. Whether the SCADA work was done well, badly, or at all, nobody has verified.
Problem
Solution

Some SCADA records sit in Excel, some in a WhatsApp group, some in a folder of photos. There is no single source of truth for the SCADA, so every SCADA question takes an hour and three people to answer.
Problem
Solution

An auditor visits and asks for proof of the last six SCADA checks. The records are spread across phones, drives, and a filing cabinet. Compliance is a feeling, not a fact.
Problem
Solution
SCADA Compliance App keeps SCADA compliance current by evidencing RTU and PLC status, communications and redundancy, alarms and setpoints, data logging and historian, and access control and cybersecurity. The photos and readings each rule expects are mandatory fields, so an incomplete check cannot be closed and a gap is caught before an assessor finds it. Renewals and statutory due dates are flagged before they lapse. If a check fails, the template opens its follow-up questions and requires photo evidence, so every gap is documented on the spot rather than reconstructed later from memory.
The compliance check targets the SCADA failures that matter most: RTU or PLC fault, comms loss or no redundancy, alarm flood or wrong setpoint, and logging gap. Left unchecked, a fault such as rtu or plc fault can mean downtime, a safety incident, or a failed audit, so every finding becomes an owned task with a deadline. It stays open until photo proof of the repair is reviewed, and repeat problems are flagged so control and automation teams fix the cause rather than the symptom. Prioritising by severity means the most serious issues are handled first, not whichever was reported loudest.
SCADA Compliance App keeps SCADA checks aligned to IEC 62443 and ISA-95. The photos and readings each standard expects are required fields, so an incomplete check cannot be closed and a gap is caught before an assessor finds it. When a review is due, control and automation teams pull the records for the site in scope with one search instead of rebuilding them from folders. Retention and history stay searchable, so proof remains defensible at any point, not only on the day of an audit.
Yes. SCADA Compliance App is offline-first: teams complete SCADA checks on iOS or Android with no signal, capturing photos and the evidence each check requires in the field. Each record syncs automatically when the connection returns, with its timestamp intact, and the same template runs on every site. So control and automation teams get a live view of what is complete, overdue, or failing per location, and a weak connection in a plant room or basement never costs a round or loses a photo.
Every completed SCADA compliance check carries system status screenshot, alarm log note, and access record, a GPS location, a timestamp, and a named sign-off. Because the evidence is captured during the round rather than typed up afterwards, control and automation teams can show exactly what was checked, when, and by whom. When an assessor or client asks, the record exports in seconds as a branded PDF or a searchable history, so proof never depends on someone remembering where a photo was saved or which folder holds last quarter's records.
Explore other inspection and audit apps for facilities management teams.
Last updated: