Take a Photo. AI Fills the Form.
Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.
No typing. No manual entry.
Catch every defect before handover, with photos, owners and sign-off.
7 sections46 questions20 to 45 minutesFree
Photo Added
Photo Added
Photo Added7 sections · 46 questions · 20 to 45 minutes · Free
Site, block and unit
Date and inspector
Contractor and client present
Areas in scope
Walls free of cracks and nail pops
Paint finish even, no runs or patches
Ceilings level, no stains or cracks
Floor tiles level and fully grouted
Skirting fitted with no gaps
Sealant neat at all junctions
Timber floors free of scratches
Surfaces clean of debris and paint
Doors open, close and latch smoothly
Locks and keys work for every door
Windows open, close and seal
Glass free of scratches and chips
Ironmongery fitted and tight
Wardrobes and cabinets aligned
Weather seals intact
Frames painted and undamaged
Worktops level and undamaged
Taps run hot and cold, no leaks
Sinks and basins drain freely
Toilets flush and refill
Shower screens sealed
Tiling and grout complete
Extractor fans working
Appliances fitted and working
Sockets and switches working
Lights working in every room
Consumer unit labelled
Heating and AC responding
Smoke detectors fitted and tested
Water pressure acceptable
No visible leaks at pipework
Meters read and recorded
Balcony railings secure
Stairs and handrails safe
Fire doors close fully
Exit signs and lighting working
Lobby and corridors finished
Parking and access clear
Every defect photographed and located
Severity and owner assigned
Re-inspection date agreed
Contractor and client signatures
Three steps, about 20 to 45 minutes a unit.
Room by room, one check at a time.
Tap Fail, add a photo, assign who fixes it.
The report is ready the moment you finish.
Paper for a one-off walk-round. The app when every snag needs fixing.
Branded checklist
Customize with your logo and company details.
Quick answer
A snagging inspection checklist is the structured record site teams use to log defects, capture photo evidence per item, and track every snag through to verified closure before handover. Run it on the InspectWrk mobile app to work offline on site, assign fixes to the responsible trade, and generate the punch list report automatically.
A snagging inspection checklist is an organized document used to identify defects, incomplete work, and finishing issues before practical completion or handover. It defines what to inspect room by room, how to record each defect with photo evidence, severity, and location, and how to verify fixes, so the site team, main contractor, and client work from one clear punch list instead of scattered WhatsApp photos and notes. Used through fit-out completion and pre-handover walks, it ties every snag to a trade and a closeout status, with non-conformance reports raised where workmanship falls short of the drawings or IS codes.
It is used by site supervisors, QA QC engineers, contractors, and property managers during walkthroughs of apartments, commercial fit-outs, and common areas. A consistent snagging process reduces rework, prevents handover delays, and creates an auditable record of what was found and resolved.
Your snag list lives in an Excel file shared on WhatsApp. The contractor marks items as done. Nobody walks the unit to verify the fix. The same defect comes back at final handover, in front of the client.
The snag report was supposed to go out on Friday. Someone is still assembling it from photos on their phone on Monday. By then the client has already found the defect your team missed.
A snagging inspection checklist supports construction quality and handover discipline. By providing a systematic approach to capture defects and drive closure, this checklist provides essential benefits including:
A structured snagging record should include the context of the walkthrough, the areas and items you inspect, and space for evidence and sign-off. Here are the key elements to take note of:
This section ties the inspection to a specific property, phase, and route. It typically includes:
Use this part to check visible finishes and fit-out quality room by room. Common checkpoints include:
Capture basic functional and safety observations that affect handover. Examples include:
Each defect should be actionable and traceable. This section usually covers:
Follow these steps to run a consistent snagging inspection and maintain a clear punch list through to closure:
See how this checklist fits into Construction inspection software.
This checklist runs as a mobile inspection app that works fully offline on site, with AI-powered defect detection on every photo. To see it on your own workflows, talk to our team.
Submit an inspection and AI writes the PDF report and Excel sheet for you. No admin, no waiting.
Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.
No typing. No manual entry.
Inspectors speak their observations in any language. AI transcribes and fills the form in real time.
Completely hands-free in the field.
The moment an inspection is submitted, AI summarises the findings and builds a branded PDF report and an Excel sheet for you.
No manual reporting. No copy-paste.
InspectWrk integrates with the tools your team already uses, including Zoho, Microsoft 365, and SAP.
No double entry.
Your operations team sees completion rates, open issues, and compliance scores across all sites in real time.
No chasing updates.
See which checklists your team has in progress across every site, jump into the same inspection with one tap, and keep field, supervisor, and back-office views in sync without sending screenshots on WhatsApp.
Every team reports differently. Build the report your operations, quality, or compliance leads actually want to read, share it as a branded PDF, and schedule delivery to the stakeholders who need it.
See completion, pass rate, and recurring findings across every checklist and every site, without pulling spreadsheets together at the end of the month.
See this checklist running on your own project in a 30-minute demo.
Book a Free DemoA list of defects and unfinished work found in a new or renovated property, recorded so the contractor can fix them before or soon after handover.
Before handover, during the final walk-round with the contractor, and again during the defects liability period to check fixes.
The main contractor is usually responsible for fixing defects within the agreed defects liability period.
Around 20 to 45 minutes for a typical apartment with this checklist. Larger homes and common areas take longer.
Yes. In the InspectWrk app you can complete the checklist and capture photos without a signal. Everything syncs when you are back online.
Yes. Get a branded version with your logo and sections set up for your team. Get Your Company Branded Checklist
In the app, each failed item becomes an action with an owner and due date. The re-inspection shows only open snags until they are closed with photo evidence.
Pre-handover snagging for new build apartments. Room-by-room finish checks, MEP, and defect tracking before keys.
Snagging and punch list for new build houses. Defect capture, evidence, and closeout before handover.
Kitchen snagging: cabinets, worktops, appliances, tiling, plumbing, and electrical checks.
Bathroom snagging: tiling, sanitaryware, plumbing, ventilation, and finish quality.
Living room snagging: walls, flooring, ceiling, windows, electrical, and finish quality.
Post move-in defects: snagging items found after handover, defect liability tracking, and closeout.