Take a Photo. AI Fills the Form.
Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.
No typing. No manual entry.
Use this ashrae 170 checklist to run checks on facility, space classification and applicable edition, ventilation rates: outdoor air and total air, pressure relationships and airflow direction, exhaust and air recirculation, filtration, and temperature and humidity, recording pass, fail, or N/A and capturing a photo on anything that needs proof.
9 sections29 questions16 to 30 minutesFree
Photo Added
Photo Added
Photo Added9 sections · 29 questions · 16 to 30 minutes · Free
Record the facility name, location and the healthcare space or spaces inspected.
Record the space category.
Record the specific space type, for example operating room, airborne infection isolation room, protective environment or patient room.
Record the edition of ANSI/ASHRAE/ASHE Standard 170 adopted by the authority having jurisdiction, and the inspection date.
Confirm the outdoor-air rate for the space meets the requirement for its space type in the applicable edition.
Confirm the total air (air-change rate) for the space meets the requirement for its space type in the applicable edition.
Record the measured outdoor-air and total-air or air-change values and the required values from the applicable edition.
Record the required pressure relationship for the space type.
Confirm the actual pressure relationship and airflow direction match the requirement for the space type.
Record the measured pressure differential and any continuous monitoring or device in place.
Confirm the exhaust requirements for the space are met, for example exhaust to outdoors where required.
Confirm the air recirculation restrictions are observed where recirculation is limited or prohibited for the space type.
Record the exhaust arrangement and any deviation found.
Confirm the filtration, including filter efficiency and the number of filter stages, meets the requirement for the space type in the applicable edition.
Confirm filters are correctly installed, sealed and within serviceable condition.
Confirm the space temperature is within the range specified for its space type in the applicable edition.
Confirm the space relative humidity is within the range specified for its space type in the applicable edition.
Record the measured temperature and relative humidity.
Confirm outdoor-air intakes are located and separated from exhaust discharges and contamination sources as required.
Confirm the HVAC system design and equipment serving the space have been verified against the approved design and the applicable edition.
Record the HVAC systems serving the space and any design references.
Confirm system start-up and any required commissioning for the space have been completed.
Confirm testing, adjusting and balancing has been performed and the results recorded.
Record the testing and balancing report reference and the verification measurements.
Record each deficiency against the applicable edition of Standard 170, with the space and the requirement it relates to.
Record the severity of the most significant deficiency.
Record the corrective action, responsible person and target date.
Record the overall result against the applicable edition.
Record the inspector, the evidence and measurements attached, and sign-off.
Three steps, about 16 to 30 minutes.
Section by section, one check at a time.
Tap Fail, add a photo, assign who fixes it.
The report is ready the moment you finish.
Paper for a one-off check. The app when every finding needs fixing.
Branded checklist
Customize with your logo and company details.
Quick answer
An ashrae 170 checklist is the structured inspection used to verify healthcare-space ventilation against the applicable edition of ASHRAE Standard 170 that healthcare teams use to check the key inspection points, assign owners to any failures, and close them with photo proof. Completed in InspectWrk, it is timestamped, works offline, and exports as an audit-ready healthcare report for ANSI/ASHRAE/ASHE Standard 170 (Ventilation of Health Care Facilities), in the edition adopted by the authority having jurisdiction and the approved HVAC design and applicable local requirements.
An ashrae 170 checklist is the structured inspection used to verify healthcare-space ventilation against the applicable edition of ASHRAE Standard 170 that healthcare teams use to check facility, space classification and applicable edition, ventilation rates: outdoor air and total air, pressure relationships and airflow direction, exhaust and air recirculation, filtration, and temperature and humidity, capture photo evidence, and track corrective actions to closure. Its job is to verify healthcare-space ventilation against the applicable edition of ASHRAE Standard 170.
Healthcare facilities engineers and HVAC commissioning and balancing specialists still miss unresolved ashrae defects and repeat findings when rounds are ticked without photo evidence on each ashrae check.
Without a single inspection record, teams reconstruct the evidence from phones instead of proving ANSI/ASHRAE/ASHE Standard 170 (Ventilation of Health Care Facilities), in the edition adopted by the authority having jurisdiction and the approved HVAC design and applicable local requirements readiness.
It helps healthcare facilities engineers and supervisors keep healthcare work consistent, safe, and auditable, with the evidence needed for ANSI/ASHRAE/ASHE Standard 170 (Ventilation of Health Care Facilities), in the edition adopted by the authority having jurisdiction and the approved HVAC design and applicable local requirements:
A complete ashrae 170 checklist works through facility, space classification and applicable edition, ventilation rates: outdoor air and total air, pressure relationships and airflow direction, exhaust and air recirculation, filtration, and temperature and humidity, then records inspection context, scored checkpoints, and evidence with corrective actions:
Record where and when the inspection runs:
Define what each checkpoint verifies and how results are scored:
Make every finding traceable and actionable:
Follow these steps to run the ashrae 170 checklist:
See how this checklist fits into Healthcare inspection software.
This checklist runs as a mobile inspection app that works fully offline on site, with AI-powered defect detection on every photo. To see it on your own workflows, talk to our team.
Submit an inspection and AI writes the PDF report and Excel sheet for you. No admin, no waiting.
Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.
No typing. No manual entry.
Inspectors speak their observations in any language. AI transcribes and fills the form in real time.
Completely hands-free in the field.
The moment an inspection is submitted, AI summarises the findings and builds a branded PDF report and an Excel sheet for you.
No manual reporting. No copy-paste.
InspectWrk integrates with the tools your team already uses, including Zoho, Microsoft 365, and SAP.
No double entry.
Your operations team sees completion rates, open issues, and compliance scores across all sites in real time.
No chasing updates.
See which checklists your team has in progress across every site, jump into the same inspection with one tap, and keep field, supervisor, and back-office views in sync without sending screenshots on WhatsApp.
Every team reports differently. Build the report your operations, quality, or compliance leads actually want to read, share it as a branded PDF, and schedule delivery to the stakeholders who need it.
See completion, pass rate, and recurring findings across every checklist and every site, without pulling spreadsheets together at the end of the month.
See this checklist running on your own sites in a 30-minute demo.
Book a Free DemoIt is scoped to the scheduled cadence and controls that healthcare facilities engineers, HVAC commissioning and balancing specialists run, not a one-off handover walk. It prompts facility, space classification and applicable edition, ventilation rates: outdoor air and total air, pressure relationships and airflow direction, exhaust and air recirculation, filtration, and temperature and humidity, watching for unresolved ashrae defects and repeat findings, records pass, fail, or N/A with photo evidence on each ashrae check on critical items, and raises corrective actions with owners before sign-off. Run in InspectWrk, the record is timestamped and rolls into trend reports so repeat failures surface before the next audit.
They work through each checkpoint to verify healthcare-space ventilation against the applicable edition of ASHRAE Standard 170, confirm the required controls are in place, and capture photo evidence on each ashrae check on anything that fails or needs proof. Priority failure modes include unresolved ashrae defects and repeat findings. Each checkpoint takes pass, fail, or N/A, and a failed item stays open until the fix is verified.
It expects photo evidence on each ashrae check on failed or critical items, so findings rest on proof rather than memory. Records support ANSI/ASHRAE/ASHE Standard 170 (Ventilation of Health Care Facilities), in the edition adopted by the authority having jurisdiction and the approved HVAC design and applicable local requirements, and every photo, note, and sign-off stays attached to the inspection instead of living in chat threads.
The ashrae 170 checklist covers facility, space classification and applicable edition, ventilation rates: outdoor air and total air, pressure relationships and airflow direction, exhaust and air recirculation, filtration, and temperature and humidity. On each checkpoint, healthcare facilities engineers record pass, fail, or N/A, add a photo on anything that needs proof, and raise a corrective action with an owner and due date. Run in InspectWrk, the inspection is timestamped, traceable to whoever completed it, and exports as a single healthcare report aligned to ANSI/ASHRAE/ASHE Standard 170 (Ventilation of Health Care Facilities), in the edition adopted by the authority having jurisdiction and the approved HVAC design and applicable local requirements.

Test medical-gas alarms: area and master alarms, alarm activation, audible and visual indicators, pressure conditions, sensor response, and panel status, with test results.

Inspect a mechanical ventilator for operational readiness: power supply, battery, self-test, alarm functionality, oxygen and air supply connections, breathing circuit, tubing and connectors, filters, sensors, display, and controls, with cleaning and inspection documentation.
Inspect the autoclave or steam sterilizer as equipment: chamber condition, door, locking mechanism and gasket, pressure and temperature indicators, controls and cycle settings, alarms, water supply and drainage, leaks and corrosion, cycle records, and sterilization indicators.
Inspect a multiparameter patient monitor: display, power and battery, alarm system, ECG leads, SpO2 sensor, blood-pressure cuff, temperature probe, cables and connectors, and controls, with physical-condition checks, cleaning, and functional testing.