ASHRAE 170 Checklist

Use this ashrae 170 checklist to run checks on facility, space classification and applicable edition, ventilation rates: outdoor air and total air, pressure relationships and airflow direction, exhaust and air recirculation, filtration, and temperature and humidity, recording pass, fail, or N/A and capturing a photo on anything that needs proof.

9 sections29 questions16 to 30 minutesFree

ASHRAE 170Ward 3 · Facility, Space Classification and Applicable Edition0 of 3 checked
  • Record the space category.Smiling nurse in scrubs and doctor in a white coat review a tablet by a bedPhoto Added
  • Record the exhaust arrangement and any deviation found.Smiling nurse in scrubs and doctor in a white coat review a tablet by a bedPhoto Added
  • Record the measured temperature and relative humidity.Smiling nurse in scrubs and doctor in a white coat review a tablet by a bedPhoto Added
Free on iOS and AndroidGet the App

What’s in this checklist.

9 sections · 29 questions · 16 to 30 minutes · Free

    1. Record the facility name, location and the healthcare space or spaces inspected.

      Enter text
    2. Record the space category.

    3. Record the specific space type, for example operating room, airborne infection isolation room, protective environment or patient room.

      Enter text
    4. Record the edition of ANSI/ASHRAE/ASHE Standard 170 adopted by the authority having jurisdiction, and the inspection date.

      Enter text
    1. Confirm the outdoor-air rate for the space meets the requirement for its space type in the applicable edition.

    2. Confirm the total air (air-change rate) for the space meets the requirement for its space type in the applicable edition.

    3. Record the measured outdoor-air and total-air or air-change values and the required values from the applicable edition.

      Enter text
    1. Record the required pressure relationship for the space type.

    2. Confirm the actual pressure relationship and airflow direction match the requirement for the space type.

    3. Record the measured pressure differential and any continuous monitoring or device in place.

      Enter text
    1. Confirm the exhaust requirements for the space are met, for example exhaust to outdoors where required.

    2. Confirm the air recirculation restrictions are observed where recirculation is limited or prohibited for the space type.

    3. Record the exhaust arrangement and any deviation found.

      Enter text
    1. Confirm the filtration, including filter efficiency and the number of filter stages, meets the requirement for the space type in the applicable edition.

    2. Confirm filters are correctly installed, sealed and within serviceable condition.

    1. Confirm the space temperature is within the range specified for its space type in the applicable edition.

    2. Confirm the space relative humidity is within the range specified for its space type in the applicable edition.

    3. Record the measured temperature and relative humidity.

      Enter text
    1. Confirm outdoor-air intakes are located and separated from exhaust discharges and contamination sources as required.

    2. Confirm the HVAC system design and equipment serving the space have been verified against the approved design and the applicable edition.

    3. Record the HVAC systems serving the space and any design references.

      Enter text
    1. Confirm system start-up and any required commissioning for the space have been completed.

    2. Confirm testing, adjusting and balancing has been performed and the results recorded.

    3. Record the testing and balancing report reference and the verification measurements.

      Enter text
    1. Record each deficiency against the applicable edition of Standard 170, with the space and the requirement it relates to.

      Enter text
    2. Record the severity of the most significant deficiency.

    3. Record the corrective action, responsible person and target date.

      Enter text
    4. Record the overall result against the applicable edition.

    5. Record the inspector, the evidence and measurements attached, and sign-off.

      Enter text

How the ASHRAE 170 checklist works.

Three steps, about 16 to 30 minutes.

  1. Work through each section

    Section by section, one check at a time.

  2. Log every finding

    Tap Fail, add a photo, assign who fixes it.

  3. Sign off and share

    The report is ready the moment you finish.

Same checklist, two ways to run it.

Paper for a one-off check. The app when every finding needs fixing.

Printed PDF

  • Pen on paper
  • Photos in your camera roll
  • Report typed up later

InspectWrk appRecommended

  • Photos on every finding
  • Owner and due date per finding
  • Report ready at sign-off
Get the App

Branded checklist

Get Your Company Branded Checklist

Customize with your logo and company details.

We respect your privacy. No spam, ever.

What is an ashrae 170 checklist?

Quick answer

An ashrae 170 checklist is the structured inspection used to verify healthcare-space ventilation against the applicable edition of ASHRAE Standard 170 that healthcare teams use to check the key inspection points, assign owners to any failures, and close them with photo proof. Completed in InspectWrk, it is timestamped, works offline, and exports as an audit-ready healthcare report for ANSI/ASHRAE/ASHE Standard 170 (Ventilation of Health Care Facilities), in the edition adopted by the authority having jurisdiction and the approved HVAC design and applicable local requirements.

An ashrae 170 checklist is the structured inspection used to verify healthcare-space ventilation against the applicable edition of ASHRAE Standard 170 that healthcare teams use to check facility, space classification and applicable edition, ventilation rates: outdoor air and total air, pressure relationships and airflow direction, exhaust and air recirculation, filtration, and temperature and humidity, capture photo evidence, and track corrective actions to closure. Its job is to verify healthcare-space ventilation against the applicable edition of ASHRAE Standard 170.

Why are ashrae 170 inspections still chased on WhatsApp?

Healthcare facilities engineers and HVAC commissioning and balancing specialists still miss unresolved ashrae defects and repeat findings when rounds are ticked without photo evidence on each ashrae check.

Without a single inspection record, teams reconstruct the evidence from phones instead of proving ANSI/ASHRAE/ASHE Standard 170 (Ventilation of Health Care Facilities), in the edition adopted by the authority having jurisdiction and the approved HVAC design and applicable local requirements readiness.

Before and After InspectWrk

Before InspectWrk

  • Ward rounds, housekeeping audits, and biomedical PPM live in separate paper binders across departments.
  • Ashrae checks are ticked on paper without photo evidence per finding.
  • NABH auditors find scattered records and missing evidence, surfaced only during the audit itself.

After InspectWrk

  • Healthcare facilities engineers complete the inspection in the app with photo evidence at the ashrae 170, even offline.
  • Managers see open findings, closure status, and ANSI/ASHRAE/ASHE Standard 170 (Ventilation of Health Care Facilities), in the edition adopted by the authority having jurisdiction and the approved HVAC design and applicable local requirements evidence live on one dashboard.
  • A failed sterile-zone or biomedical waste check raises a corrective action with an owner before the next audit.

Why is an ashrae 170 checklist important?

It helps healthcare facilities engineers and supervisors keep healthcare work consistent, safe, and auditable, with the evidence needed for ANSI/ASHRAE/ASHE Standard 170 (Ventilation of Health Care Facilities), in the edition adopted by the authority having jurisdiction and the approved HVAC design and applicable local requirements:

  • Cover the full inspection: structured checks across facility, space classification and applicable edition, ventilation rates: outdoor air and total air, pressure relationships and airflow direction, and exhaust and air recirculation surface unresolved ashrae defects and repeat findings before they reach handover, audit, or the next shift.
  • Document healthcare findings with the right proof: capture photo evidence on each ashrae check on every issue so nothing rests on memory.
  • Stop repeat healthcare findings: assign the fix, set a deadline, and escalate overdue actions before the next round comes around.
  • Stay audit-ready: keep one timestamped record for ANSI/ASHRAE/ASHE Standard 170 (Ventilation of Health Care Facilities), in the edition adopted by the authority having jurisdiction and the approved HVAC design and applicable local requirements you can export instead of rebuilding it from scattered photos and spreadsheets.

What should be included in an ashrae 170 checklist?

A complete ashrae 170 checklist works through facility, space classification and applicable edition, ventilation rates: outdoor air and total air, pressure relationships and airflow direction, exhaust and air recirculation, filtration, and temperature and humidity, then records inspection context, scored checkpoints, and evidence with corrective actions:

Inspection context

Record where and when the inspection runs:

  • Site, healthcare location, and asset identification
  • Inspector, date, and the healthcare areas or assets in scope
  • Reference numbers or schedules linked to the checklist

Checkpoints and scoring

Define what each checkpoint verifies and how results are scored:

  • Facility, Space Classification and Applicable Edition
  • Ventilation Rates: Outdoor Air and Total Air
  • Pressure Relationships and Airflow Direction
  • Exhaust and Air Recirculation
  • Filtration
  • Temperature and Humidity
  • 20 fields aligned to the checklist

Evidence and corrective actions

Make every finding traceable and actionable:

  • Capture photo evidence on each ashrae check on failed or critical items
  • Corrective actions with owners and due dates for healthcare teams
  • Sign-off, completion status, and follow-up notes

How do teams use an ashrae 170 checklist?

Follow these steps to run the ashrae 170 checklist:

  1. Fill in the ashrae 170 header: inspector, site, date, and areas in scope.
  2. Work through facility, space classification and applicable edition, ventilation rates: outdoor air and total air, pressure relationships and airflow direction, exhaust and air recirculation, filtration, and temperature and humidity in order, recording pass, fail, or N/A.
  3. Attach photo evidence on each ashrae check wherever a failure or observation needs proof.
  4. Raise actions for unresolved ashrae defects and repeat findings with owners and deadlines before sign-off.
  5. Review the ashrae 170 summary, share the report, and keep the record for your audit trail.

See how this checklist fits into Healthcare inspection software.

This checklist runs as a mobile inspection app that works fully offline on site, with AI-powered defect detection on every photo. To see it on your own workflows, talk to our team.

AI-Powered Features for Your Field Workflows

Submit an inspection and AI writes the PDF report and Excel sheet for you. No admin, no waiting.

01 / 05Photo to formVISION AI

Take a Photo. AI Fills the Form.

Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.

No typing. No manual entry.

02 / 05Voice to textVOICE AI

Speak. AI Writes It Down.

Inspectors speak their observations in any language. AI transcribes and fills the form in real time.

Completely hands-free in the field.

03 / 05Auto reportsREPORT AI

AI Writes the Report. PDF and Excel, Instantly.

The moment an inspection is submitted, AI summarises the findings and builds a branded PDF report and an Excel sheet for you.

No manual reporting. No copy-paste.

04 / 05IntegrationsINTEGRATIONS

Connect Your Existing Tools.

InspectWrk integrates with the tools your team already uses, including Zoho, Microsoft 365, and SAP.

No double entry.

05 / 05Live dashboardLIVE DATA

Live Dashboard. Every Site. Always On.

Your operations team sees completion rates, open issues, and compliance scores across all sites in real time.

No chasing updates.

One Platform. Mobile-First. AI-Powered.

  • Collaborate

    Collaborate with your team anytime, anywhere

    See which checklists your team has in progress across every site, jump into the same inspection with one tap, and keep field, supervisor, and back-office views in sync without sending screenshots on WhatsApp.

    • Organise inspection data by site, team, and date
    • Assign checks to the inspector or vendor responsible
    • Track completion across every location in one view
    • Keep field and back-office in sync in real time
    • Comment on findings without leaving the inspection
  • Custom Reports

    Custom reports that guide your decision making

    Every team reports differently. Build the report your operations, quality, or compliance leads actually want to read, share it as a branded PDF, and schedule delivery to the stakeholders who need it.

    • Branded PDF and CSV export from any completed inspection
    • Schedule weekly or monthly delivery to managers and clients
    • Share to email, Drive, Teams, or Slack in one click
    • Filter findings by site, severity, or corrective-action status
  • Powerful Analytics

    Analyse your inspection data with confidence

    See completion, pass rate, and recurring findings across every checklist and every site, without pulling spreadsheets together at the end of the month.

    Powerful dashboard
    Combine multiple reports into one dashboard so you can monitor status, bottlenecks, and completion trends at a glance.
    Always in sync
    Changes sync across devices so inspectors, supervisors, and back-office teams always see the latest responses and attachments.
    Embedded analytics
    Explore checklist data with charts and breakdowns that stay tied to the underlying inspections, without exporting to spreadsheets.

ASHRAE 170questions

See this checklist running on your own sites in a 30-minute demo.

Book a Free Demo

It is scoped to the scheduled cadence and controls that healthcare facilities engineers, HVAC commissioning and balancing specialists run, not a one-off handover walk. It prompts facility, space classification and applicable edition, ventilation rates: outdoor air and total air, pressure relationships and airflow direction, exhaust and air recirculation, filtration, and temperature and humidity, watching for unresolved ashrae defects and repeat findings, records pass, fail, or N/A with photo evidence on each ashrae check on critical items, and raises corrective actions with owners before sign-off. Run in InspectWrk, the record is timestamped and rolls into trend reports so repeat failures surface before the next audit.

They work through each checkpoint to verify healthcare-space ventilation against the applicable edition of ASHRAE Standard 170, confirm the required controls are in place, and capture photo evidence on each ashrae check on anything that fails or needs proof. Priority failure modes include unresolved ashrae defects and repeat findings. Each checkpoint takes pass, fail, or N/A, and a failed item stays open until the fix is verified.

It expects photo evidence on each ashrae check on failed or critical items, so findings rest on proof rather than memory. Records support ANSI/ASHRAE/ASHE Standard 170 (Ventilation of Health Care Facilities), in the edition adopted by the authority having jurisdiction and the approved HVAC design and applicable local requirements, and every photo, note, and sign-off stays attached to the inspection instead of living in chat threads.

The ashrae 170 checklist covers facility, space classification and applicable edition, ventilation rates: outdoor air and total air, pressure relationships and airflow direction, exhaust and air recirculation, filtration, and temperature and humidity. On each checkpoint, healthcare facilities engineers record pass, fail, or N/A, add a photo on anything that needs proof, and raise a corrective action with an owner and due date. Run in InspectWrk, the inspection is timestamped, traceable to whoever completed it, and exports as a single healthcare report aligned to ANSI/ASHRAE/ASHE Standard 170 (Ventilation of Health Care Facilities), in the edition adopted by the authority having jurisdiction and the approved HVAC design and applicable local requirements.

More healthcare checklists.

  • Hands typing on a laptop showing pie and bar charts, with a phone and tablet nearby
    Healthcare9,400+ downloads

    Medical Gas Alarm Test Checklist

    Test medical-gas alarms: area and master alarms, alarm activation, audible and visual indicators, pressure conditions, sensor response, and panel status, with test results.

    • Healthcare
    • Medical gas
    Get Checklist: Medical Gas Alarm Test Checklist
  • Worker in yellow hard hat crouching on a rooftop of solar panels while holding a radio
    Healthcare9,400+ downloads

    Ventilator Inspection Checklist

    Inspect a mechanical ventilator for operational readiness: power supply, battery, self-test, alarm functionality, oxygen and air supply connections, breathing circuit, tubing and connectors, filters, sensors, display, and controls, with cleaning and inspection documentation.

    • Ventilator
    • Respiratory
    Get Checklist: Ventilator Inspection Checklist
  • Autoclave, Steam Sterilizer Inspection Checklist checklist in use
    Healthcare9,200+ downloads

    Autoclave, Steam Sterilizer Inspection Checklist

    Inspect the autoclave or steam sterilizer as equipment: chamber condition, door, locking mechanism and gasket, pressure and temperature indicators, controls and cycle settings, alarms, water supply and drainage, leaks and corrosion, cycle records, and sterilization indicators.

    • Autoclave
    • Steam sterilizer
    Get Checklist: Autoclave, Steam Sterilizer Inspection Checklist
  • Patient Monitor Inspection Checklist checklist in use
    Healthcare9,200+ downloads

    Patient Monitor Inspection Checklist

    Inspect a multiparameter patient monitor: display, power and battery, alarm system, ECG leads, SpO2 sensor, blood-pressure cuff, temperature probe, cables and connectors, and controls, with physical-condition checks, cleaning, and functional testing.

    • Patient monitor
    • Multiparameter
    Get Checklist: Patient Monitor Inspection Checklist