Take a Photo. AI Fills the Form.
Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.
No typing. No manual entry.
Use this mammography unit preventive maintenance checklist to check equipment identification and service history, mechanical condition, compression mechanism, detector and imaging components, positioning system, and exposure controls, logging issues with photos and notes and assigning corrective actions before sign-off.
11 sections22 questions10 to 20 minutesFree
Photo Added
Photo Added
Photo Added11 sections · 22 questions · 10 to 20 minutes · Free
Record the mammography unit make, model, serial number, and location.
Confirm the service history and last preventive-maintenance and physics QA dates.
Check gantry rotation, tube-head movement, and height adjustment travel smoothly and lock.
Inspect the unit for loose panels, damage, and worn components.
Confirm compression applies smoothly, holds force, and releases correctly.
Verify the displayed compression force and thickness are accurate against a reference.
Inspect the detector and paddles for damage, and confirm the detector is clean.
Confirm image acquisition completes without artefacts on a phantom.
Check bucky, paddles, and face shield fit, latch, and position correctly.
Confirm collimation aligns to the detector and field size is correct.
Verify automatic exposure control and manual technique factors operate correctly.
Confirm exposure indicators and interlocks function.
Confirm the acquisition workstation and controls respond and display correctly.
Check all indicators and status lights operate.
Inspect power and data cables and connectors for damage and secure fit.
Confirm cabling is managed and strain-relieved.
Review phantom image quality against the QA baseline and tolerance.
Record any change in contrast, resolution, or artefacts.
Confirm emergency stop, warning indicators, and radiation interlocks operate.
Confirm calibration and physics QA are within their required interval.
Record all findings and measurements with evidence.
Raise a corrective action with owner and due date, and hold the unit if image quality fails QA.
Three steps, about 10 to 20 minutes.
Section by section, one check at a time.
Tap Fail, add a photo, assign who fixes it.
The report is ready the moment you finish.
Paper for a one-off check. The app when every finding needs fixing.
Branded checklist
Customize with your logo and company details.
Quick answer
A mammography unit preventive maintenance checklist is the planned maintenance verification used to confirm biomedical equipment is calibrated, electrically safe, and fit for clinical use that healthcare teams use to check the key inspection points, assign owners to any failures, and close them with photo proof. Completed in InspectWrk, it is timestamped, works offline, and exports as an audit-ready healthcare report for NABH, NABL and Bio-Medical Waste Management Rules.
A mammography unit preventive maintenance checklist is the planned maintenance verification used to confirm biomedical equipment is calibrated, electrically safe, and fit for clinical use that healthcare teams use to check equipment identification and service history, mechanical condition, compression mechanism, detector and imaging components, positioning system, and exposure controls, capture photo evidence, and track corrective actions to closure. Its job is to confirm biomedical equipment is calibrated, electrically safe, and fit for clinical use. Complete preventive maintenance on a mammography unit: equipment identification and service history, mechanical condition, compression mechanism, detector and imaging components, positioning system, exposure controls, displays, cables, image-quality verification, and safety controls. It is sometimes called the Mammography Machine Maintenance Checklist or the Mammography Equipment PM Checklist.
Biomedical engineering teams still miss out-of-calibration devices, failed leakage or earth test and flat batteries or silenced alarms when rounds are ticked without calibration label photo, safety-test reading and asset tag photo.
Without service tags and calibration stickers, teams reconstruct the evidence from phones instead of proving NABH, NABL and Bio-Medical Waste Management Rules readiness.
It helps infection control nurses and supervisors keep healthcare work consistent, safe, and auditable, with the evidence needed for NABH, NABL and Bio-Medical Waste Management Rules:
A complete mammography unit preventive maintenance checklist works through equipment identification and service history, mechanical condition, compression mechanism, detector and imaging components, positioning system, and exposure controls, then records inspection context, scored checkpoints, and evidence with corrective actions:
Record where and when the inspection runs:
Define what each checkpoint verifies and how results are scored:
Make every finding traceable and actionable:
Follow these steps to run the mammography unit preventive maintenance checklist:
See how this checklist fits into Healthcare inspection software.
This checklist runs as a mobile inspection app that works fully offline on site, with AI-powered defect detection on every photo. To see it on your own workflows, talk to our team.
Submit an inspection and AI writes the PDF report and Excel sheet for you. No admin, no waiting.
Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.
No typing. No manual entry.
Inspectors speak their observations in any language. AI transcribes and fills the form in real time.
Completely hands-free in the field.
The moment an inspection is submitted, AI summarises the findings and builds a branded PDF report and an Excel sheet for you.
No manual reporting. No copy-paste.
InspectWrk integrates with the tools your team already uses, including Zoho, Microsoft 365, and SAP.
No double entry.
Your operations team sees completion rates, open issues, and compliance scores across all sites in real time.
No chasing updates.
See which checklists your team has in progress across every site, jump into the same inspection with one tap, and keep field, supervisor, and back-office views in sync without sending screenshots on WhatsApp.
Every team reports differently. Build the report your operations, quality, or compliance leads actually want to read, share it as a branded PDF, and schedule delivery to the stakeholders who need it.
See completion, pass rate, and recurring findings across every checklist and every site, without pulling spreadsheets together at the end of the month.
See this checklist running on your own sites in a 30-minute demo.
Book a Free DemoIt is scoped to the preventive maintenance cadence and controls that infection control nurses, biomedical engineers, facility managers, NABH coordinators run, not a one-off handover walk. It prompts equipment identification and service history, mechanical condition, compression mechanism, detector and imaging components, positioning system, and exposure controls, watching for out-of-calibration devices, failed leakage or earth test and flat batteries or silenced alarms, records pass, fail, or N/A with calibration label photo, safety-test reading and asset tag photo on critical items, and raises corrective actions with owners before sign-off. Run in InspectWrk, the record is timestamped and rolls into trend reports so repeat failures surface before the next audit.
They work through each checkpoint to confirm biomedical equipment is calibrated, electrically safe, and fit for clinical use, confirm the required controls are in place, and capture calibration label photo, safety-test reading and asset tag photo on anything that fails or needs proof. Priority failure modes include out-of-calibration devices, failed leakage or earth test and flat batteries or silenced alarms. Each checkpoint takes pass, fail, or N/A, and a failed item stays open until the fix is verified.
It expects calibration label photo, safety-test reading and asset tag photo, plus service tags and calibration stickers on failed or critical items, so findings rest on proof rather than memory. Records support NABH, NABL and Bio-Medical Waste Management Rules, and every photo, note, and sign-off stays attached to the inspection instead of living in chat threads.
The mammography unit preventive maintenance checklist covers equipment identification and service history, mechanical condition, compression mechanism, detector and imaging components, positioning system, and exposure controls. On each checkpoint, infection control nurses record pass, fail, or N/A, add a photo on anything that needs proof, and raise a corrective action with an owner and due date. Run in InspectWrk, the inspection is timestamped, traceable to whoever completed it, and exports as a single healthcare report aligned to NABH, NABL and Bio-Medical Waste Management Rules.

Test medical-gas alarms: area and master alarms, alarm activation, audible and visual indicators, pressure conditions, sensor response, and panel status, with test results.

Inspect a mechanical ventilator for operational readiness: power supply, battery, self-test, alarm functionality, oxygen and air supply connections, breathing circuit, tubing and connectors, filters, sensors, display, and controls, with cleaning and inspection documentation.
Inspect the autoclave or steam sterilizer as equipment: chamber condition, door, locking mechanism and gasket, pressure and temperature indicators, controls and cycle settings, alarms, water supply and drainage, leaks and corrosion, cycle records, and sterilization indicators.
Inspect a multiparameter patient monitor: display, power and battery, alarm system, ECG leads, SpO2 sensor, blood-pressure cuff, temperature probe, cables and connectors, and controls, with physical-condition checks, cleaning, and functional testing.