Use this ftth installation checklist to check site and installation information, site survey, fiber cable installation, fiber termination and splicing, ONT and ONU installation, and optical testing, scoring each item and raising corrective actions with owners and due dates.
10 sections30 questions16 to 30 minutesFree
Photo Added
Photo Added
Photo Added10 sections · 30 questions · 16 to 30 minutes · Free
Record the customer or site, installation address and work order or project ID.
Record the installation date, technician and network or route information.
Confirm the service type and installation scope.
Check the installation route, entry point and existing infrastructure.
Confirm duct or conduit availability, pole or aerial route and building entry where applicable.
Record the fiber path, equipment location, access constraints and required materials.
Confirm the correct cable type, route, protection and support.
Check the bend radius and pulling tension against the manufacturer specifications.
Confirm cable identification, slack or storage loops, no physical damage and separation from incompatible services where applicable.
Check connector type, cleanliness and termination quality.
Confirm splice enclosure, splice protection, fiber routing and fiber management.
Check unused fibers, closure condition and labeling.
Confirm the ONT or ONU location, mounting and fiber connection.
Check power connection, power supply and backup power where applicable.
Confirm cable routing, indicator or status lights and equipment identification.
Measure optical power and optical loss and confirm link continuity.
Carry out OTDR testing and check connector and splice loss where applicable.
Compare results against the acceptance criteria from the network design and optical budget, and record test equipment and evidence.
Confirm ONT or ONU registration and optical link status.
Check internet connectivity, service activation and download and upload testing.
Verify VLAN or service configuration and VoIP or IPTV where included.
Check work-at-height controls, PPE, electrical hazards and safe access as applicable.
Confirm cable handling, tool condition, housekeeping and fiber shard disposal.
Check warning signage and traffic or pedestrian controls where applicable; mark N/A where not applicable.
Check fiber and cable labels, distribution point and port identification.
Confirm ONT or ONU information, splice records, fiber route and test results.
Confirm photos, as-built information and customer handover information.
Record each check as pass, fail or N/A with a photo and any defect.
Assign a corrective action, owner and due date.
Confirm corrective actions are completed and verified before handover.
Three steps, about 16 to 30 minutes.
Section by section, one check at a time.
Tap Fail, add a photo, assign who fixes it.
The report is ready the moment you finish.
Paper for a one-off check. The app when every finding needs fixing.
Branded checklist
Customize with your logo and company details.
Quick answer
A ftth installation checklist is the structured inspection used to verify FTTH cable installation, fiber connections, optical testing, equipment setup and service readiness, and track corrective actions that information technology & telecommunications teams use to check the key inspection points, assign owners to any failures, and close them with photo proof. Completed in InspectWrk, it is timestamped, works offline, and exports as an audit-ready information technology & telecommunications report for the manufacturer specifications for cable, connectors and equipment, the applicable fiber installation standard and network design and the optical budget and acceptance criteria for the network.
A ftth installation checklist is the structured inspection used to verify FTTH cable installation, fiber connections, optical testing, equipment setup and service readiness, and track corrective actions that information technology & telecommunications teams use to check site and installation information, site survey, fiber cable installation, fiber termination and splicing, ONT and ONU installation, and optical testing, capture photo evidence, and track corrective actions to closure. Its job is to verify FTTH cable installation, fiber connections, optical testing, equipment setup and service readiness, and track corrective actions.
FTTH installers and technicians and Fiber splicing and test technicians still miss unresolved ftth installation defects and repeat findings when rounds are ticked without service tags and maintenance logs.
Without service tags and maintenance logs, teams reconstruct the evidence from phones instead of proving the manufacturer specifications for cable, connectors and equipment, the applicable fiber installation standard and network design and the optical budget and acceptance criteria for the network readiness.
It helps ftth installers and technicians and supervisors keep information technology & telecommunications work consistent, safe, and auditable, with the evidence needed for the manufacturer specifications for cable, connectors and equipment, the applicable fiber installation standard and network design and the optical budget and acceptance criteria for the network:
A complete ftth installation checklist works through site and installation information, site survey, fiber cable installation, fiber termination and splicing, ONT and ONU installation, and optical testing, then records inspection context, scored checkpoints, and evidence with corrective actions:
Record where and when the inspection runs:
Define what each checkpoint verifies and how results are scored:
Make every finding traceable and actionable:
Follow these steps to run the ftth installation checklist:
See how this checklist fits into Telecommunications inspection software.
This checklist runs as a mobile inspection app that works fully offline on site, with AI-powered defect detection on every photo. To see it on your own workflows, talk to our team.
Submit an inspection and AI writes the PDF report and Excel sheet for you. No admin, no waiting.
Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.
No typing. No manual entry.
Inspectors speak their observations in any language. AI transcribes and fills the form in real time.
Completely hands-free in the field.
The moment an inspection is submitted, AI summarises the findings and builds a branded PDF report and an Excel sheet for you.
No manual reporting. No copy-paste.
InspectWrk integrates with the tools your team already uses, including Zoho, Microsoft 365, and SAP.
No double entry.
Your operations team sees completion rates, open issues, and compliance scores across all sites in real time.
No chasing updates.
See which checklists your team has in progress across every site, jump into the same inspection with one tap, and keep field, supervisor, and back-office views in sync without sending screenshots on WhatsApp.
Every team reports differently. Build the report your operations, quality, or compliance leads actually want to read, share it as a branded PDF, and schedule delivery to the stakeholders who need it.
See completion, pass rate, and recurring findings across every checklist and every site, without pulling spreadsheets together at the end of the month.
See this checklist running on your own sites in a 30-minute demo.
Book a Free DemoIt is scoped to the scheduled cadence and controls that ftth installers and technicians, fiber splicing and test technicians, field supervisors and QA, network commissioning teams run, not a one-off handover walk. It prompts site and installation information, site survey, fiber cable installation, fiber termination and splicing, ONT and ONU installation, and optical testing, watching for unresolved ftth installation defects and repeat findings, records pass, fail, or N/A with service tags and maintenance logs on critical items, and raises corrective actions with owners before sign-off. Run in InspectWrk, the record is timestamped and rolls into trend reports so repeat failures surface before the next audit.
They work through each checkpoint to verify FTTH cable installation, fiber connections, optical testing, equipment setup and service readiness, and track corrective actions, confirm the required controls are in place, and capture service tags and maintenance logs on anything that fails or needs proof. Priority failure modes include unresolved ftth installation defects and repeat findings. Each checkpoint takes pass, fail, or N/A, and a failed item stays open until the fix is verified.
It expects service tags and maintenance logs, plus service tags and maintenance logs on failed or critical items, so findings rest on proof rather than memory. Records support the manufacturer specifications for cable, connectors and equipment, the applicable fiber installation standard and network design and the optical budget and acceptance criteria for the network, and every photo, note, and sign-off stays attached to the inspection instead of living in chat threads.
The ftth installation checklist covers site and installation information, site survey, fiber cable installation, fiber termination and splicing, ONT and ONU installation, and optical testing. On each checkpoint, ftth installers and technicians record pass, fail, or N/A, add a photo on anything that needs proof, and raise a corrective action with an owner and due date. Run in InspectWrk, the inspection is timestamped, traceable to whoever completed it, and exports as a single information technology & telecommunications report aligned to the manufacturer specifications for cable, connectors and equipment, the applicable fiber installation standard and network design and the optical budget and acceptance criteria for the network.

Record and check data-center and server-room environmental conditions: monitoring location and zone, rack or room identification, temperature and relative-humidity readings against target ranges, sensor identification, out-of-range readings, and environmental alarms, with corrective actions and follow-up verification.

Give your Information Technology & Telecommunications team a repeatable process for cell tower inspection software.

Give your Information Technology & Telecommunications team a repeatable process for data centre inspection software.

Give your Information Technology & Telecommunications team a repeatable process for fibre install inspection app.