Geotechnical Assessment Record Form

Use this geotechnical assessment record form to work through permanent inspection records and evidence via inspection records on mining sites so teams can confirm the geotechnical assessment remains serviceable, covering permanent inspection records and evidence via inspection records, recording pass, fail, or N/A and capturing a photo on anything that needs proof. Watch for unresolved geotechnical assessment defects and repeat findings. Records support DGMS regulations, ISO 45001 and the Mines Act.

6 sections22 questions16 to 30 minutesFree

Geotechnical Assessment RecordPit 2 · Inspection Checkpoints0 of 3 checked
  • Check convergence and movement monitoring readings.Two workers in hard hats and safety vests standing before a giant yellow mining truckPhoto Added
  • Confirm drainage and control of water ingress.Two workers in hard hats and safety vests standing before a giant yellow mining truckPhoto Added
  • Assess blast damage and barricade exclusion zones.Two workers in hard hats and safety vests standing before a giant yellow mining truckPhoto Added
Free on iOS and AndroidGet the App

What’s in this checklist.

6 sections · 22 questions · 16 to 30 minutes · Free

Geotechnical Assessment Record6 sections · 22 questions0 of 22 answered
    1. Record the site or location, area, and date of this geotechnical.

    2. Record the inspector and the scope or items included in this inspection.

    3. Confirm any relevant reference documents or standards are available.

    1. Confirm the geotechnical covers the excavation, walls, and support in scope.

    2. Check the roof and walls for loose ground and complete scaling.

    3. Verify support installation, type, and density against the plan.

    4. Check convergence and movement monitoring readings.

    5. Confirm drainage and control of water ingress.

    6. Assess blast damage and barricade exclusion zones.

    7. Record hazards and geotechnical observations for action.

    1. Check for loose ground or inadequate scaling.

    2. Check for insufficient or missing support.

    3. Check for movement or convergence.

    4. Check for water ingress.

    1. Capture face and wall photo.

    2. Capture movement monitoring reading.

    3. Capture support installation record.

    1. Confirm the inspection meets the requirements of MSHA standards and ISO 45001.

    2. Confirm records are retained for the required period and available for audit.

    1. Attach photo evidence for every non-compliant finding.

    2. Assign each deficiency to an owner with a corrective action and due date.

    3. Confirm re-inspection requirements are recorded before sign-off.

Tap an answer to try it. Nothing is saved.Get the App

How the Geotechnical Assessment Record form works.

Three steps, about 16 to 30 minutes.

  1. Work through each section

    Section by section, one check at a time.

  2. Log every finding

    Tap Fail, add a photo, assign who fixes it.

  3. Sign off and share

    The report is ready the moment you finish.

Same checklist, two ways to run it.

Paper for a one-off check. The app when every finding needs fixing.

Printed PDF

  • Pen on paper
  • Photos in your camera roll
  • Report typed up later

InspectWrk appRecommended

  • Photos on every finding
  • Owner and due date per finding
  • Report ready at sign-off
Get the App

Branded checklist

Get Your Company Branded Checklist

Customize with your logo and company details.

We respect your privacy. No spam, ever.

What is a geotechnical assessment record form?

Quick answer

A geotechnical assessment record form is the inspection record workflow used to confirm the geotechnical assessment remains serviceable, covering permanent inspection records and evidence via inspection records that mining teams use to check the key inspection points, assign owners to any failures, and close them with photo proof. Completed in InspectWrk, it is timestamped, works offline, and exports as an audit-ready mining report for DGMS regulations, ISO 45001 and the Mines Act.

A geotechnical assessment record form is the inspection record workflow used to confirm the geotechnical assessment remains serviceable, covering permanent inspection records and evidence via inspection records that mining teams use to check permanent inspection records and evidence via inspection records, capture photo evidence, and track corrective actions to closure. Its job is to confirm the geotechnical assessment remains serviceable, covering permanent inspection records and evidence via inspection records. This geotechnical assessment record form keeps a dated, signed log of wall and batter inspections, with mapped defects, monitoring trends, and actions raised to control ground risk.

Why can nobody find last month's geotechnical assessment inspection record?

Mine safety officers, Shift supervisors and Maintenance engineers still miss unresolved geotechnical assessment defects and repeat findings when rounds are ticked without inspection records.

Without inspection records, teams reconstruct the evidence from phones instead of proving DGMS regulations, ISO 45001 and the Mines Act readiness.

Before and After InspectWrk

Before InspectWrk

  • mining inspection records for geotechnical assessment happen on paper or in WhatsApp threads, with no timestamp and no photo evidence.
  • Geotechnical assessment checks are ticked on paper without photo evidence per finding.
  • You find out about a geotechnical assessment issue from a client complaint or an auditor, not from your own team in real time.

After InspectWrk

  • Mine safety officers complete the inspection record in the app with photo evidence at the geotechnical assessment, even offline.
  • Managers see open findings, closure status, and DGMS regulations, ISO 45001 and the Mines Act evidence live on one dashboard.
  • Overdue corrective actions escalate automatically so the fix happens before the next mining audit.

Why is a geotechnical assessment record form important?

It helps mine safety officers and supervisors keep mining work consistent, safe, and auditable, with the evidence needed for DGMS regulations, ISO 45001 and the Mines Act:

  • Cover the full inspection: structured checks across permanent inspection records and evidence via inspection records surface unresolved geotechnical assessment defects and repeat findings before they reach handover, audit, or the next shift.
  • Document mining findings with the right proof: capture inspection records on every issue so nothing rests on memory.
  • Track mining fixes to closure: each failure becomes an action with an owner, a due date, and a re-inspection that confirms it is done.
  • Stay audit-ready: keep one timestamped record for DGMS regulations, ISO 45001 and the Mines Act you can export instead of rebuilding it from scattered photos and spreadsheets.

What should be included in a geotechnical assessment record form?

A complete geotechnical assessment record form works through permanent inspection records and evidence via inspection records, then records inspection context, scored checkpoints, and evidence with corrective actions:

Inspection context

Record where and when the inspection runs:

  • Site, mining location, and asset identification
  • Inspector, date, and the mining areas or assets in scope
  • Reference numbers or schedules linked to the checklist

Checkpoints and scoring

Define what each checkpoint verifies and how results are scored:

  • permanent inspection records and evidence via inspection records
  • Failure watchouts: unresolved geotechnical assessment defects and repeat findings
  • Evidence: inspection records
  • Documents: inspection records
  • 20 fields aligned to the checklist

Evidence and corrective actions

Make every finding traceable and actionable:

  • Capture inspection records on failed or critical items
  • Retain inspection records with the inspection record
  • Sign-off, completion status, and follow-up notes

How do teams use a geotechnical assessment record form?

Follow these steps to run the geotechnical assessment record form:

  1. Fill in the geotechnical assessment header: inspector, site, date, and areas in scope.
  2. Work through permanent inspection records and evidence via inspection records in order, recording pass, fail, or N/A.
  3. Attach inspection records wherever a failure or observation needs proof.
  4. Raise actions for unresolved geotechnical assessment defects and repeat findings with owners and deadlines before sign-off.
  5. Review the geotechnical assessment summary, share the report, and keep the record for your audit trail.

See how this checklist fits into Mining inspection software.

This checklist runs as a mobile inspection app that works fully offline on site, with AI-powered defect detection on every photo. To see it on your own workflows, talk to our team.

AI-Powered Features for Your Field Workflows

Submit an inspection and AI writes the PDF report and Excel sheet for you. No admin, no waiting.

01 / 05Photo to formVISION AI

Take a Photo. AI Fills the Form.

Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.

No typing. No manual entry.

02 / 05Voice to textVOICE AI

Speak. AI Writes It Down.

Inspectors speak their observations in any language. AI transcribes and fills the form in real time.

Completely hands-free in the field.

03 / 05Auto reportsREPORT AI

AI Writes the Report. PDF and Excel, Instantly.

The moment an inspection is submitted, AI summarises the findings and builds a branded PDF report and an Excel sheet for you.

No manual reporting. No copy-paste.

04 / 05IntegrationsINTEGRATIONS

Connect Your Existing Tools.

InspectWrk integrates with the tools your team already uses, including Zoho, Microsoft 365, and SAP.

No double entry.

05 / 05Live dashboardLIVE DATA

Live Dashboard. Every Site. Always On.

Your operations team sees completion rates, open issues, and compliance scores across all sites in real time.

No chasing updates.

One Platform. Mobile-First. AI-Powered.

  • Collaborate

    Collaborate with your team anytime, anywhere

    See which checklists your team has in progress across every site, jump into the same inspection with one tap, and keep field, supervisor, and back-office views in sync without sending screenshots on WhatsApp.

    • Organise inspection data by site, team, and date
    • Assign checks to the inspector or vendor responsible
    • Track completion across every location in one view
    • Keep field and back-office in sync in real time
    • Comment on findings without leaving the inspection
  • Custom Reports

    Custom reports that guide your decision making

    Every team reports differently. Build the report your operations, quality, or compliance leads actually want to read, share it as a branded PDF, and schedule delivery to the stakeholders who need it.

    • Branded PDF and CSV export from any completed inspection
    • Schedule weekly or monthly delivery to managers and clients
    • Share to email, Drive, Teams, or Slack in one click
    • Filter findings by site, severity, or corrective-action status
  • Powerful Analytics

    Analyse your inspection data with confidence

    See completion, pass rate, and recurring findings across every checklist and every site, without pulling spreadsheets together at the end of the month.

    Powerful dashboard
    Combine multiple reports into one dashboard so you can monitor status, bottlenecks, and completion trends at a glance.
    Always in sync
    Changes sync across devices so inspectors, supervisors, and back-office teams always see the latest responses and attachments.
    Embedded analytics
    Explore checklist data with charts and breakdowns that stay tied to the underlying inspections, without exporting to spreadsheets.

Geotechnical Assessment Recordquestions

See this checklist running on your own sites in a 30-minute demo.

Book a Free Demo

It is scoped to the scheduled cadence and controls that mine safety officers, shift supervisors, maintenance engineers, HSE managers run, not a one-off handover walk. It prompts permanent inspection records and evidence via inspection records, watching for unresolved geotechnical assessment defects and repeat findings, records pass, fail, or N/A with inspection records on critical items, and raises corrective actions with owners before sign-off. Run in InspectWrk, the record is timestamped and rolls into trend reports so repeat failures surface before the next audit.

They work through each checkpoint to confirm the geotechnical assessment remains serviceable, covering permanent inspection records and evidence via inspection records, confirm the required controls are in place, and capture inspection records on anything that fails or needs proof. Priority failure modes include unresolved geotechnical assessment defects and repeat findings. Each checkpoint takes pass, fail, or N/A, and a failed item stays open until the fix is verified.

It expects inspection records, plus inspection records on failed or critical items, so findings rest on proof rather than memory. Records support DGMS regulations, ISO 45001 and the Mines Act, and every photo, note, and sign-off stays attached to the inspection instead of living in chat threads.

It checks permanent inspection records and evidence via inspection records across mining sites. The round exists to confirm the geotechnical assessment remains serviceable, covering permanent inspection records and evidence via inspection records. It prioritises failure modes such as unresolved geotechnical assessment defects and repeat findings. Mine safety officers record pass, fail, or N/A on each item, capture photo evidence on anything that needs proof, and assign corrective actions with owners and due dates. Evidence expectations include inspection records. A failed item stays open until the fix is verified, and it runs offline so a weak signal never costs a round. Run in InspectWrk, every finding is timestamped and exports as a single mining report aligned to DGMS regulations, ISO 45001 and the Mines Act.

More mining checklists.