Use this NFPA fire inspection checklist to check applicable NFPA codes and facility profile, fire prevention and housekeeping, means of egress, exits and doors, emergency lighting and exit signage, portable fire extinguishers, and fire alarm and detection systems, scoring each item and raising corrective actions with owners and due dates.
11 sections55 questions16 to 30 minutesFree
Photo Added
Photo Added
Photo Added11 sections · 55 questions · 16 to 30 minutes · Free
Record the occupancy classification and the facility areas covered by this inspection.
Identify the NFPA codes adopted by the authority having jurisdiction (AHJ), typically NFPA 101 Life Safety Code and NFPA 1 Fire Code.
List the fire protection systems present so the applicable system standards (for example NFPA 10, 13, 25, 72, 80) can be applied.
Confirm the edition of each code is the one adopted by the AHJ, and note any local amendments.
Mark requirements that do not apply to this occupancy as N/A rather than as a pass.
Check that combustible waste, packaging and rubbish are controlled and removed, and that ignition sources are managed.
Confirm required clearances are kept around heating equipment, electrical panels and heat-producing appliances.
Check that flammable and combustible liquids are stored, labeled and used correctly.
Confirm smoking controls and hot-work permit arrangements are in place where applicable.
Check that fire lanes, hydrants and fire department access points are clear and unobstructed.
Confirm exit access, exits and exit discharge are continuous, unobstructed and unlocked in the direction of egress.
Check that corridors, aisles and stairs are kept clear and at the required width for the occupancy.
Confirm exit doors, hardware and panic or fire-exit devices operate correctly.
Check that travel distance, number of exits and occupant load meet the applicable code for the space.
Confirm exits are not obstructed by storage, decorations or dead-end arrangements.
Confirm exit signs are present, legible, correctly located and illuminated.
Test emergency and egress lighting and confirm it operates on loss of normal power for the required duration.
Check that directional signage clearly indicates the path to exits.
Confirm the results of emergency lighting tests are recorded.
Check batteries, fittings and any generator-backed lighting are serviceable.
Confirm extinguishers are the correct type and rating for the hazards, and are mounted, accessible and unobstructed.
Check travel distance to an extinguisher meets the applicable requirement for the hazard class.
Confirm gauges read in the operable range and pins, seals and hoses are intact.
Check monthly quick-checks and the annual service and any hydrostatic test are current on the tag.
Record any extinguisher that is missing, discharged or overdue for service (deep ITM: see the NFPA 10 extinguisher checklist).
Confirm the fire alarm panel is normal with no active trouble or supervisory signals.
Check that manual call points, detectors and notification appliances are in place, unobstructed and undamaged.
Confirm monitoring and the connection to the receiving station or fire department are in service.
Check that the required periodic testing and maintenance is current and recorded.
Record any impairment and the interim measures in place (deep ITM: see the NFPA 72 fire alarm checklist).
Confirm control valves are open, supervised or sealed, and gauges read the expected pressures.
Check sprinkler heads are unobstructed, undamaged and have the required clearance below them, with spare heads and a wrench available.
Confirm fire pumps, tanks and standpipe or hose connections are serviceable where fitted.
Check that special suppression systems (for example kitchen hood or clean-agent) are serviced and in date.
Record any impairment and interim measures (deep ITM: see the NFPA 25 water-based systems checklist).
Confirm fire doors are self-closing, latch fully and are not wedged, blocked or modified.
Check labels, gaps, seals and hardware on fire and smoke door assemblies.
Confirm fire and smoke barriers, walls and floors are intact with no unsealed penetrations (see the fire-stopping checklist for penetrations).
Check that fire and smoke dampers are in place and have been tested where required.
Record any breach or defect in a rated assembly for corrective action.
Check electrical panels for clearance, cover integrity and no signs of overheating or damage.
Confirm no unapproved extension leads, daisy-chained power boards or overloaded circuits are in use.
Check storage is kept below the required clearance from sprinklers and away from egress and electrical equipment.
Confirm high-hazard and combustible storage areas have the required separation and protection.
Record electrical and storage hazards that could start or spread a fire.
Confirm the emergency plan, evacuation procedures and floor plans are current and posted where required.
Check that fire drills are conducted and recorded at the required frequency.
Confirm staff, wardens and occupants are trained on alarms, evacuation and extinguisher use as applicable.
Check assembly points, evacuation aids and provisions for people needing assistance are in place.
Confirm coordination with the fire department and any required notifications is arranged.
Confirm inspection, testing and maintenance (ITM) records for each system are complete and current.
Record each finding as pass, fail or N/A against the applicable NFPA requirement with a photograph.
Log every deficiency and assign a corrective action, responsible person and due date.
Track impairments and interim measures until systems are restored.
Verify completed corrective actions and reinspect to confirm closure with evidence.
Three steps, about 16 to 30 minutes.
Section by section, one check at a time.
Tap Fail, add a photo, assign who fixes it.
The report is ready the moment you finish.
Paper for a one-off check. The app when every finding needs fixing.
Branded checklist
Customize with your logo and company details.
Quick answer
An NFPA fire inspection checklist is the structured inspection used to assess the facility against the applicable NFPA fire and life-safety requirements, document evidence, and track deficiencies to corrective action and reinspection that health & safety teams use to check the key inspection points, assign owners to any failures, and close them with photo proof. Completed in InspectWrk, it is timestamped, works offline, and exports as an audit-ready health & safety report for the NFPA codes adopted by your authority having jurisdiction (AHJ), typically NFPA 101 Life Safety Code and NFPA 1 Fire Code, the NFPA standards for the systems present (for example NFPA 10 for extinguishers, NFPA 13 and NFPA 25 for sprinklers, NFPA 72 for fire alarm and NFPA 80 for fire doors) and the manufacturer instructions and the applicable local fire code and AHJ requirements.
An NFPA fire inspection checklist is the structured inspection used to assess the facility against the applicable NFPA fire and life-safety requirements, document evidence, and track deficiencies to corrective action and reinspection that health & safety teams use to check applicable NFPA codes and facility profile, fire prevention and housekeeping, means of egress, exits and doors, emergency lighting and exit signage, portable fire extinguishers, and fire alarm and detection systems, capture photo evidence, and track corrective actions to closure. Its job is to assess the facility against the applicable NFPA fire and life-safety requirements, document evidence, and track deficiencies to corrective action and reinspection.
Facility and building managers and Fire safety officers and fire wardens still miss fire and life-safety deficiencies and overdue corrective actions when rounds are ticked without photo evidence.
Without inspection, testing and maintenance (ITM) records and deficiency reports, teams reconstruct the evidence from phones instead of proving the NFPA codes adopted by your authority having jurisdiction (AHJ), typically NFPA 101 Life Safety Code and NFPA 1 Fire Code, the NFPA standards for the systems present (for example NFPA 10 for extinguishers, NFPA 13 and NFPA 25 for sprinklers, NFPA 72 for fire alarm and NFPA 80 for fire doors) and the manufacturer instructions and the applicable local fire code and AHJ requirements readiness.
It helps facility and building managers and supervisors keep health & safety work consistent, safe, and auditable, with the evidence needed for the NFPA codes adopted by your authority having jurisdiction (AHJ), typically NFPA 101 Life Safety Code and NFPA 1 Fire Code, the NFPA standards for the systems present (for example NFPA 10 for extinguishers, NFPA 13 and NFPA 25 for sprinklers, NFPA 72 for fire alarm and NFPA 80 for fire doors) and the manufacturer instructions and the applicable local fire code and AHJ requirements:
A complete NFPA fire inspection checklist works through means of egress, fire alarm and detection, sprinkler and suppression systems, extinguishers, fire doors and rated assemblies, and inspection, testing and maintenance records, then records inspection context, scored checkpoints, and evidence with corrective actions:
Record where and when the inspection runs:
Define what each checkpoint verifies and how results are scored:
Make every finding traceable and actionable:
Follow these steps to run the NFPA fire inspection checklist:
See how this checklist fits into AI safety inspection software.
This checklist runs as a mobile inspection app that works fully offline on site, with AI-powered defect detection on every photo. To see it on your own workflows, talk to our team.
Submit an inspection and AI writes the PDF report and Excel sheet for you. No admin, no waiting.
Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.
No typing. No manual entry.
Inspectors speak their observations in any language. AI transcribes and fills the form in real time.
Completely hands-free in the field.
The moment an inspection is submitted, AI summarises the findings and builds a branded PDF report and an Excel sheet for you.
No manual reporting. No copy-paste.
InspectWrk integrates with the tools your team already uses, including Zoho, Microsoft 365, and SAP.
No double entry.
Your operations team sees completion rates, open issues, and compliance scores across all sites in real time.
No chasing updates.
See which checklists your team has in progress across every site, jump into the same inspection with one tap, and keep field, supervisor, and back-office views in sync without sending screenshots on WhatsApp.
Every team reports differently. Build the report your operations, quality, or compliance leads actually want to read, share it as a branded PDF, and schedule delivery to the stakeholders who need it.
See completion, pass rate, and recurring findings across every checklist and every site, without pulling spreadsheets together at the end of the month.
See this checklist running on your own sites in a 30-minute demo.
Book a Free DemoIt is scoped to the scheduled cadence and controls that facility and building managers, fire safety officers and fire wardens, EHS and compliance teams, fire protection contractors and AHJ inspectors run, not a one-off handover walk. It prompts means of egress, fire alarm and detection, sprinkler and suppression systems, extinguishers, fire doors and rated assemblies, and inspection, testing and maintenance records, watching for fire and life-safety deficiencies and overdue corrective actions, records pass, fail, or N/A with photo evidence on critical items, and raises corrective actions with owners before sign-off. Run in InspectWrk, the record is timestamped and rolls into trend reports so repeat failures surface before the next audit.
They work through each checkpoint to assess the facility against the applicable NFPA fire and life-safety requirements, document evidence, and track deficiencies to corrective action and reinspection, confirm the required controls are in place, and capture photo evidence on anything that fails or needs proof. Priority failure modes include fire and life-safety deficiencies and overdue corrective actions. Each checkpoint takes pass, fail, or N/A, and a failed item stays open until the fix is verified.
It expects photo evidence, plus inspection, testing and maintenance (ITM) records and deficiency reports on failed or critical items, so findings rest on proof rather than memory. Records support the NFPA codes adopted by your authority having jurisdiction (AHJ), typically NFPA 101 Life Safety Code and NFPA 1 Fire Code, the NFPA standards for the systems present (for example NFPA 10 for extinguishers, NFPA 13 and NFPA 25 for sprinklers, NFPA 72 for fire alarm and NFPA 80 for fire doors) and the manufacturer instructions and the applicable local fire code and AHJ requirements, and every photo, note, and sign-off stays attached to the inspection instead of living in chat threads.
The NFPA fire inspection checklist covers applicable NFPA codes and facility profile, fire prevention and housekeeping, means of egress, exits and doors, emergency lighting and exit signage, portable fire extinguishers, and fire alarm and detection systems. On each checkpoint, facility and building managers record pass, fail, or N/A, add a photo on anything that needs proof, and raise a corrective action with an owner and due date. Run in InspectWrk, the inspection is timestamped, traceable to whoever completed it, and exports as a single health & safety report aligned to the NFPA codes adopted by your authority having jurisdiction (AHJ), typically NFPA 101 Life Safety Code and NFPA 1 Fire Code, the NFPA standards for the systems present (for example NFPA 10 for extinguishers, NFPA 13 and NFPA 25 for sprinklers, NFPA 72 for fire alarm and NFPA 80 for fire doors) and the manufacturer instructions and the applicable local fire code and AHJ requirements.

Safety inspections with hazard identification, corrective actions, and compliance reporting.

Report incidents and near-misses with details, photos, location, and timeline.

Inspect grounding and bonding systems: grounding conductors and electrodes, bonding connections, equipment grounding, continuity, corrosion, and panel connections.

Verify arc-flash labels on electrical equipment: presence, visibility, legibility, equipment identification, voltage and incident-energy information, PPE data, and label condition.