Cooling Tower Preventive Maintenance Checklist

Use this cooling tower preventive maintenance checklist to work through tower identification and condition, basin and sump, fill and drift eliminators, water distribution and nozzles, fans, motors and gearbox, and belts and bearings, capturing photo evidence per finding and tracking each fix through to closure.

8 sections24 questions14 to 26 minutesFree

Cooling Tower Preventive MaintenanceTower A · Tower Identification & Condition0 of 3 checked
  • Record the cooling tower tag, location, and duty.Facilities team reviewing site status in a plant control roomPhoto Added
  • Confirm the tower matches the asset register and PM schedule.Facilities team reviewing site status in a plant control roomPhoto Added
  • Inspect the casing, structure, and access for damage and corrosion.Facilities team reviewing site status in a plant control roomPhoto Added
Free on iOS and AndroidGet the App

What’s in this checklist.

8 sections · 24 questions · 14 to 26 minutes · Free

    1. Record the cooling tower tag, location, and duty.

    2. Confirm the tower matches the asset register and PM schedule.

    3. Inspect the casing, structure, and access for damage and corrosion.

    1. Inspect the cold-water basin and sump for debris, silt, and corrosion.

    2. Check the make-up water float and level control operate.

    3. Confirm the basin heater operates where fitted.

    1. Inspect the fill media for fouling, scaling, and damage.

    2. Check drift eliminators are intact and correctly seated.

    3. Confirm airflow paths through the fill are unobstructed.

    1. Check the hot-water distribution basin or header for even flow.

    2. Inspect spray nozzles for blockage and correct spray pattern.

    3. Confirm troughs and orifices are clear.

    1. Inspect fan blades and hub for damage, cracks, and balance.

    2. Check the fan motor for noise, vibration, and running amps.

    3. Confirm the gearbox oil level and condition where fitted.

    1. Inspect drive belts for wear, cracking, and correct tension.

    2. Check bearings for noise, play, and lubrication.

    3. Confirm couplings and guards are secure.

    1. Clean strainers and confirm they are correctly refitted.

    2. Check the blowdown and bleed valves and lines are clear and operate.

    3. Record vibration, corrosion, and scaling on mechanical components.

    1. Confirm mechanical cleaning is completed per the schedule.

    2. Capture a photo of every failed item as evidence.

    3. Raise a corrective action with an owner and due date, and record the maintenance.

How the Cooling Tower Preventive Maintenance checklist works.

Three steps, about 14 to 26 minutes.

  1. Work through each section

    Section by section, one check at a time.

  2. Log every finding

    Tap Fail, add a photo, assign who fixes it.

  3. Sign off and share

    The report is ready the moment you finish.

Same checklist, two ways to run it.

Paper for a one-off check. The app when every finding needs fixing.

Printed PDF

  • Pen on paper
  • Photos in your camera roll
  • Report typed up later

InspectWrk appRecommended

  • Photos on every finding
  • Owner and due date per finding
  • Report ready at sign-off
Get the App

Branded checklist

Get Your Company Branded Checklist

Customize with your logo and company details.

We respect your privacy. No spam, ever.

What is a cooling tower preventive maintenance checklist?

Quick answer

A cooling tower preventive maintenance checklist is the planned maintenance verification used to confirm cooling towers remain hygienic, structurally sound, and thermally effective that facilities management teams use to check the key inspection points, assign owners to any failures, and close them with photo proof. Completed in InspectWrk, it is timestamped, works offline, and exports as an audit-ready facilities management report for OSHA, ISO 41001 and fire NOC and lift license requirements.

A cooling tower preventive maintenance checklist is the planned maintenance verification used to confirm cooling towers remain hygienic, structurally sound, and thermally effective that facilities management teams use to check tower identification and condition, basin and sump, fill and drift eliminators, water distribution and nozzles, fans, motors and gearbox, and belts and bearings, capture photo evidence, and track corrective actions to closure. Its job is to confirm cooling towers remain hygienic, structurally sound, and thermally effective. Service the mechanical side of a cooling tower: basin, fill, drift eliminators, water distribution and nozzles, fans, motors, gearbox, belts, bearings, vibration, strainers, and blowdown hardware, with cleaning and maintenance records.

Why does cooling tower preventive maintenance still run on memory?

HVAC and water hygiene technicians still miss biofilm in the basin, damaged fill and imbalanced fan when rounds are ticked without basin photo, chemistry log and fan amperage.

Without a single inspection record, teams reconstruct the evidence from phones instead of proving OSHA, ISO 41001 and fire NOC and lift license requirements readiness.

Before and After InspectWrk

Before InspectWrk

  • Centre managers send daily round photos on WhatsApp at the end of the shift.
  • Cooling tower checks are ticked on paper without photo evidence per finding.
  • Missed PPM and AMC expiry surface when a client complaint lands, not when they happened.

After InspectWrk

  • Centre managers complete the preventive maintenance check in the app with photo evidence at the cooling tower, even offline.
  • Managers see open findings, closure status, and OSHA, ISO 41001 and fire NOC and lift license requirements evidence live on one dashboard.
  • Overdue PPM, AMC expiry, and missed checks escalate automatically before the client or auditor notices.

Why is a cooling tower preventive maintenance checklist important?

It helps centre managers and supervisors keep facilities management work consistent, safe, and auditable, with the evidence needed for OSHA, ISO 41001 and fire NOC and lift license requirements:

  • Cover the full inspection: structured checks across tower identification and condition, basin and sump, fill and drift eliminators, and water distribution and nozzles surface biofilm in the basin, damaged fill and imbalanced fan before they reach handover, audit, or the next shift.
  • Document facilities management findings with the right proof: capture basin photo, chemistry log and fan amperage on every issue so nothing rests on memory.
  • Close facilities management issues instead of just logging them: assign corrective actions with owners and due dates, then verify the fix before sign-off.
  • Stay audit-ready: keep one timestamped record for OSHA, ISO 41001 and fire NOC and lift license requirements you can export instead of rebuilding it from scattered photos and spreadsheets.

What should be included in a cooling tower preventive maintenance checklist?

A complete cooling tower preventive maintenance checklist works through tower identification and condition, basin and sump, fill and drift eliminators, water distribution and nozzles, fans, motors and gearbox, and belts and bearings, then records inspection context, scored checkpoints, and evidence with corrective actions:

Inspection context

Record where and when the inspection runs:

  • Site, facilities management location, and asset identification
  • Inspector, date, and the facilities management areas or assets in scope
  • Reference numbers or schedules linked to the checklist

Checkpoints and scoring

Define what each checkpoint verifies and how results are scored:

  • Tower Identification & Condition
  • Basin & Sump
  • Fill & Drift Eliminators
  • Water Distribution & Nozzles
  • Fans, Motors & Gearbox
  • Belts & Bearings
  • 17 fields aligned to the checklist

Evidence and corrective actions

Make every finding traceable and actionable:

  • Capture basin photo, chemistry log and fan amperage on failed or critical items
  • Corrective actions with owners and due dates for facilities management teams
  • Sign-off, completion status, and follow-up notes

How do teams use a cooling tower preventive maintenance checklist?

Follow these steps to run the cooling tower preventive maintenance checklist:

  1. Confirm the cooling tower ID, last service date, and maintenance interval before you start.
  2. Complete tower identification and condition, basin and sump, fill and drift eliminators, water distribution and nozzles, fans, motors and gearbox, and belts and bearings; note parts replaced and readings.
  3. Photograph biofilm in the basin, damaged fill and imbalanced fan that triggers a follow-up work order.
  4. Assign cooling tower maintenance actions with priority and owner; link to the asset record.
  5. Sign off and update the cooling tower maintenance log so the next due date calculates automatically.

See how this checklist fits into Facility maintenance software.

This checklist runs as a mobile inspection app that works fully offline on site, with AI-powered defect detection on every photo. To see it on your own workflows, talk to our team.

AI-Powered Features for Your Field Workflows

Submit an inspection and AI writes the PDF report and Excel sheet for you. No admin, no waiting.

01 / 05Photo to formVISION AI

Take a Photo. AI Fills the Form.

Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.

No typing. No manual entry.

02 / 05Voice to textVOICE AI

Speak. AI Writes It Down.

Inspectors speak their observations in any language. AI transcribes and fills the form in real time.

Completely hands-free in the field.

03 / 05Auto reportsREPORT AI

AI Writes the Report. PDF and Excel, Instantly.

The moment an inspection is submitted, AI summarises the findings and builds a branded PDF report and an Excel sheet for you.

No manual reporting. No copy-paste.

04 / 05IntegrationsINTEGRATIONS

Connect Your Existing Tools.

InspectWrk integrates with the tools your team already uses, including Zoho, Microsoft 365, and SAP.

No double entry.

05 / 05Live dashboardLIVE DATA

Live Dashboard. Every Site. Always On.

Your operations team sees completion rates, open issues, and compliance scores across all sites in real time.

No chasing updates.

One Platform. Mobile-First. AI-Powered.

  • Collaborate

    Collaborate with your team anytime, anywhere

    See which checklists your team has in progress across every site, jump into the same inspection with one tap, and keep field, supervisor, and back-office views in sync without sending screenshots on WhatsApp.

    • Organise inspection data by site, team, and date
    • Assign checks to the inspector or vendor responsible
    • Track completion across every location in one view
    • Keep field and back-office in sync in real time
    • Comment on findings without leaving the inspection
  • Custom Reports

    Custom reports that guide your decision making

    Every team reports differently. Build the report your operations, quality, or compliance leads actually want to read, share it as a branded PDF, and schedule delivery to the stakeholders who need it.

    • Branded PDF and CSV export from any completed inspection
    • Schedule weekly or monthly delivery to managers and clients
    • Share to email, Drive, Teams, or Slack in one click
    • Filter findings by site, severity, or corrective-action status
  • Powerful Analytics

    Analyse your inspection data with confidence

    See completion, pass rate, and recurring findings across every checklist and every site, without pulling spreadsheets together at the end of the month.

    Powerful dashboard
    Combine multiple reports into one dashboard so you can monitor status, bottlenecks, and completion trends at a glance.
    Always in sync
    Changes sync across devices so inspectors, supervisors, and back-office teams always see the latest responses and attachments.
    Embedded analytics
    Explore checklist data with charts and breakdowns that stay tied to the underlying inspections, without exporting to spreadsheets.

Cooling Tower Preventive Maintenancequestions

See this checklist running on your own sites in a 30-minute demo.

Book a Free Demo

It is scoped to the preventive maintenance cadence and controls that centre managers, facility managers, AFM and CE teams, operations directors run, not a one-off handover walk. It prompts tower identification and condition, basin and sump, fill and drift eliminators, water distribution and nozzles, fans, motors and gearbox, and belts and bearings, watching for biofilm in the basin, damaged fill and imbalanced fan, records pass, fail, or N/A with basin photo, chemistry log and fan amperage on critical items, and raises corrective actions with owners before sign-off. Run in InspectWrk, the record is timestamped and rolls into trend reports so repeat failures surface before the next audit.

They work through each checkpoint to confirm cooling towers remain hygienic, structurally sound, and thermally effective, confirm the required controls are in place, and capture basin photo, chemistry log and fan amperage on anything that fails or needs proof. Priority failure modes include biofilm in the basin, damaged fill and imbalanced fan. Each checkpoint takes pass, fail, or N/A, and a failed item stays open until the fix is verified.

It expects basin photo, chemistry log and fan amperage on failed or critical items, so findings rest on proof rather than memory. Records support OSHA, ISO 41001 and fire NOC and lift license requirements, and every photo, note, and sign-off stays attached to the inspection instead of living in chat threads.

The cooling tower preventive maintenance checklist covers tower identification and condition, basin and sump, fill and drift eliminators, water distribution and nozzles, fans, motors and gearbox, and belts and bearings. On each checkpoint, centre managers record pass, fail, or N/A, add a photo on anything that needs proof, and raise a corrective action with an owner and due date. Run in InspectWrk, the inspection is timestamped, traceable to whoever completed it, and exports as a single facilities management report aligned to OSHA, ISO 41001 and fire NOC and lift license requirements.

More facilities management checklists.

  • Technician in red hard hat checking a wall mounted fire alarm panel beside red pipes
    Facilities27,400+ downloads

    Maintenance Checklist

    Run the Maintenance Checklist on the InspectWrk app to capture photo evidence per finding and generate audit-ready reports.

    • Maintenance
    • Repair
    Get Checklist: Maintenance Checklist