Use this cooling tower preventive maintenance checklist to work through tower identification and condition, basin and sump, fill and drift eliminators, water distribution and nozzles, fans, motors and gearbox, and belts and bearings, capturing photo evidence per finding and tracking each fix through to closure.
8 sections24 questions14 to 26 minutesFree
Photo Added
Photo Added
Photo Added8 sections · 24 questions · 14 to 26 minutes · Free
Record the cooling tower tag, location, and duty.
Confirm the tower matches the asset register and PM schedule.
Inspect the casing, structure, and access for damage and corrosion.
Inspect the cold-water basin and sump for debris, silt, and corrosion.
Check the make-up water float and level control operate.
Confirm the basin heater operates where fitted.
Inspect the fill media for fouling, scaling, and damage.
Check drift eliminators are intact and correctly seated.
Confirm airflow paths through the fill are unobstructed.
Check the hot-water distribution basin or header for even flow.
Inspect spray nozzles for blockage and correct spray pattern.
Confirm troughs and orifices are clear.
Inspect fan blades and hub for damage, cracks, and balance.
Check the fan motor for noise, vibration, and running amps.
Confirm the gearbox oil level and condition where fitted.
Inspect drive belts for wear, cracking, and correct tension.
Check bearings for noise, play, and lubrication.
Confirm couplings and guards are secure.
Clean strainers and confirm they are correctly refitted.
Check the blowdown and bleed valves and lines are clear and operate.
Record vibration, corrosion, and scaling on mechanical components.
Confirm mechanical cleaning is completed per the schedule.
Capture a photo of every failed item as evidence.
Raise a corrective action with an owner and due date, and record the maintenance.
Three steps, about 14 to 26 minutes.
Section by section, one check at a time.
Tap Fail, add a photo, assign who fixes it.
The report is ready the moment you finish.
Paper for a one-off check. The app when every finding needs fixing.
Branded checklist
Customize with your logo and company details.
Quick answer
A cooling tower preventive maintenance checklist is the planned maintenance verification used to confirm cooling towers remain hygienic, structurally sound, and thermally effective that facilities management teams use to check the key inspection points, assign owners to any failures, and close them with photo proof. Completed in InspectWrk, it is timestamped, works offline, and exports as an audit-ready facilities management report for OSHA, ISO 41001 and fire NOC and lift license requirements.
A cooling tower preventive maintenance checklist is the planned maintenance verification used to confirm cooling towers remain hygienic, structurally sound, and thermally effective that facilities management teams use to check tower identification and condition, basin and sump, fill and drift eliminators, water distribution and nozzles, fans, motors and gearbox, and belts and bearings, capture photo evidence, and track corrective actions to closure. Its job is to confirm cooling towers remain hygienic, structurally sound, and thermally effective. Service the mechanical side of a cooling tower: basin, fill, drift eliminators, water distribution and nozzles, fans, motors, gearbox, belts, bearings, vibration, strainers, and blowdown hardware, with cleaning and maintenance records.
HVAC and water hygiene technicians still miss biofilm in the basin, damaged fill and imbalanced fan when rounds are ticked without basin photo, chemistry log and fan amperage.
Without a single inspection record, teams reconstruct the evidence from phones instead of proving OSHA, ISO 41001 and fire NOC and lift license requirements readiness.
It helps centre managers and supervisors keep facilities management work consistent, safe, and auditable, with the evidence needed for OSHA, ISO 41001 and fire NOC and lift license requirements:
A complete cooling tower preventive maintenance checklist works through tower identification and condition, basin and sump, fill and drift eliminators, water distribution and nozzles, fans, motors and gearbox, and belts and bearings, then records inspection context, scored checkpoints, and evidence with corrective actions:
Record where and when the inspection runs:
Define what each checkpoint verifies and how results are scored:
Make every finding traceable and actionable:
Follow these steps to run the cooling tower preventive maintenance checklist:
See how this checklist fits into Facility maintenance software.
This checklist runs as a mobile inspection app that works fully offline on site, with AI-powered defect detection on every photo. To see it on your own workflows, talk to our team.
Submit an inspection and AI writes the PDF report and Excel sheet for you. No admin, no waiting.
Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.
No typing. No manual entry.
Inspectors speak their observations in any language. AI transcribes and fills the form in real time.
Completely hands-free in the field.
The moment an inspection is submitted, AI summarises the findings and builds a branded PDF report and an Excel sheet for you.
No manual reporting. No copy-paste.
InspectWrk integrates with the tools your team already uses, including Zoho, Microsoft 365, and SAP.
No double entry.
Your operations team sees completion rates, open issues, and compliance scores across all sites in real time.
No chasing updates.
See which checklists your team has in progress across every site, jump into the same inspection with one tap, and keep field, supervisor, and back-office views in sync without sending screenshots on WhatsApp.
Every team reports differently. Build the report your operations, quality, or compliance leads actually want to read, share it as a branded PDF, and schedule delivery to the stakeholders who need it.
See completion, pass rate, and recurring findings across every checklist and every site, without pulling spreadsheets together at the end of the month.
See this checklist running on your own sites in a 30-minute demo.
Book a Free DemoIt is scoped to the preventive maintenance cadence and controls that centre managers, facility managers, AFM and CE teams, operations directors run, not a one-off handover walk. It prompts tower identification and condition, basin and sump, fill and drift eliminators, water distribution and nozzles, fans, motors and gearbox, and belts and bearings, watching for biofilm in the basin, damaged fill and imbalanced fan, records pass, fail, or N/A with basin photo, chemistry log and fan amperage on critical items, and raises corrective actions with owners before sign-off. Run in InspectWrk, the record is timestamped and rolls into trend reports so repeat failures surface before the next audit.
They work through each checkpoint to confirm cooling towers remain hygienic, structurally sound, and thermally effective, confirm the required controls are in place, and capture basin photo, chemistry log and fan amperage on anything that fails or needs proof. Priority failure modes include biofilm in the basin, damaged fill and imbalanced fan. Each checkpoint takes pass, fail, or N/A, and a failed item stays open until the fix is verified.
It expects basin photo, chemistry log and fan amperage on failed or critical items, so findings rest on proof rather than memory. Records support OSHA, ISO 41001 and fire NOC and lift license requirements, and every photo, note, and sign-off stays attached to the inspection instead of living in chat threads.
The cooling tower preventive maintenance checklist covers tower identification and condition, basin and sump, fill and drift eliminators, water distribution and nozzles, fans, motors and gearbox, and belts and bearings. On each checkpoint, centre managers record pass, fail, or N/A, add a photo on anything that needs proof, and raise a corrective action with an owner and due date. Run in InspectWrk, the inspection is timestamped, traceable to whoever completed it, and exports as a single facilities management report aligned to OSHA, ISO 41001 and fire NOC and lift license requirements.

Standard site-level inspections for construction, safety, and compliance.

Complete work orders with checklist items, photos, and sign-off.

Inspect assets and equipment: condition, location, photos, and maintenance history.

Run the Maintenance Checklist on the InspectWrk app to capture photo evidence per finding and generate audit-ready reports.