Use this cooling tower water treatment system preventive maintenance checklist to inspect treatment system identification, chemical dosing equipment, ph and conductivity, water chemistry and treatment program, biocide program, and corrosion and scale control, recording pass, fail, or N/A and capturing a photo on anything that needs proof.
8 sections24 questions13 to 24 minutesFree
Photo Added
Photo Added
Photo Added8 sections · 24 questions · 13 to 24 minutes · Free
Record the cooling tower system and its water-treatment program reference.
Confirm the treatment system matches the asset register and PM schedule.
Confirm the treatment supplier and program documentation are current.
Inspect dosing pumps, lines, and injection points for leaks and correct operation.
Confirm chemical drums, day tanks, and containment are in good condition.
Check calibration of dosing equipment against the program.
Record the circulating water pH and compare it to the target range.
Record conductivity and confirm it is within the control band.
Confirm probes and analyzers are calibrated and reading correctly.
Review water chemistry results against the treatment program limits.
Confirm inhibitor and treatment levels are dosed to specification.
Record any out-of-range parameters and program adjustments.
Confirm biocide dosing and rotation follow the treatment program.
Record microbiological and dip-slide results where taken.
Confirm Legionella control measures follow the site water-safety plan.
Review corrosion and scale indicators and any coupon results.
Confirm corrosion inhibitor and scale control dosing are effective.
Note fouling trends that require program changes.
Confirm the automatic blowdown or bleed controls to the conductivity setpoint.
Check make-up and bleed metering where fitted.
Record overall water quality observations.
Confirm treatment results and dosing are logged in the water-treatment records.
Capture a photo of every failed item as evidence.
Raise a corrective action with an owner and due date for each deficiency.
Three steps, about 13 to 24 minutes.
Section by section, one check at a time.
Tap Fail, add a photo, assign who fixes it.
The report is ready the moment you finish.
Paper for a one-off check. The app when every finding needs fixing.
Branded checklist
Customize with your logo and company details.
Quick answer
A cooling tower water treatment system preventive maintenance checklist is the planned maintenance verification used to confirm the water treatment plant delivers water to specification with dosing, filtration, and monitoring in control that facilities management teams use to check the key inspection points, assign owners to any failures, and close them with photo proof. Completed in InspectWrk, it is timestamped, works offline, and exports as an audit-ready facilities management report for OSHA, ISO 41001 and fire NOC and lift license requirements.
A cooling tower water treatment system preventive maintenance checklist is the planned maintenance verification used to confirm the water treatment plant delivers water to specification with dosing, filtration, and monitoring in control that facilities management teams use to check treatment system identification, chemical dosing equipment, ph and conductivity, water chemistry and treatment program, biocide program, and corrosion and scale control, capture photo evidence, and track corrective actions to closure. Its job is to confirm the water treatment plant delivers water to specification with dosing, filtration, and monitoring in control.
Water treatment operators and plant managers still miss dosing out of range, fouled or blinded filters and readings outside limits when rounds are ticked without reading log photo, dosing pump photo and sample result note.
Without inspection records, teams reconstruct the evidence from phones instead of proving OSHA, ISO 41001 and fire NOC and lift license requirements readiness.
It helps centre managers and supervisors keep facilities management work consistent, safe, and auditable, with the evidence needed for OSHA, ISO 41001 and fire NOC and lift license requirements:
A complete cooling tower water treatment system preventive maintenance checklist works through treatment system identification, chemical dosing equipment, ph and conductivity, water chemistry and treatment program, biocide program, and corrosion and scale control, then records inspection context, scored checkpoints, and evidence with corrective actions:
Record where and when the inspection runs:
Define what each checkpoint verifies and how results are scored:
Make every finding traceable and actionable:
Follow these steps to run the cooling tower water treatment system preventive maintenance checklist:
See how this checklist fits into Facility maintenance software.
This checklist runs as a mobile inspection app that works fully offline on site, with AI-powered defect detection on every photo. To see it on your own workflows, talk to our team.
Submit an inspection and AI writes the PDF report and Excel sheet for you. No admin, no waiting.
Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.
No typing. No manual entry.
Inspectors speak their observations in any language. AI transcribes and fills the form in real time.
Completely hands-free in the field.
The moment an inspection is submitted, AI summarises the findings and builds a branded PDF report and an Excel sheet for you.
No manual reporting. No copy-paste.
InspectWrk integrates with the tools your team already uses, including Zoho, Microsoft 365, and SAP.
No double entry.
Your operations team sees completion rates, open issues, and compliance scores across all sites in real time.
No chasing updates.
See which checklists your team has in progress across every site, jump into the same inspection with one tap, and keep field, supervisor, and back-office views in sync without sending screenshots on WhatsApp.
Every team reports differently. Build the report your operations, quality, or compliance leads actually want to read, share it as a branded PDF, and schedule delivery to the stakeholders who need it.
See completion, pass rate, and recurring findings across every checklist and every site, without pulling spreadsheets together at the end of the month.
See this checklist running on your own sites in a 30-minute demo.
Book a Free DemoIt is scoped to the preventive maintenance cadence and controls that centre managers, facility managers, AFM and CE teams, operations directors run, not a one-off handover walk. It prompts treatment system identification, chemical dosing equipment, ph and conductivity, water chemistry and treatment program, biocide program, and corrosion and scale control, watching for dosing out of range, fouled or blinded filters and readings outside limits, records pass, fail, or N/A with reading log photo, dosing pump photo and sample result note on critical items, and raises corrective actions with owners before sign-off. Run in InspectWrk, the record is timestamped and rolls into trend reports so repeat failures surface before the next audit.
They work through each checkpoint to confirm the water treatment plant delivers water to specification with dosing, filtration, and monitoring in control, confirm the required controls are in place, and capture reading log photo, dosing pump photo and sample result note on anything that fails or needs proof. Priority failure modes include dosing out of range, fouled or blinded filters and readings outside limits. Each checkpoint takes pass, fail, or N/A, and a failed item stays open until the fix is verified.
It expects reading log photo, dosing pump photo and sample result note, plus inspection records on failed or critical items, so findings rest on proof rather than memory. Records support OSHA, ISO 41001 and fire NOC and lift license requirements, and every photo, note, and sign-off stays attached to the inspection instead of living in chat threads.
The cooling tower water treatment system preventive maintenance checklist covers treatment system identification, chemical dosing equipment, ph and conductivity, water chemistry and treatment program, biocide program, and corrosion and scale control. On each checkpoint, centre managers record pass, fail, or N/A, add a photo on anything that needs proof, and raise a corrective action with an owner and due date. Run in InspectWrk, the inspection is timestamped, traceable to whoever completed it, and exports as a single facilities management report aligned to OSHA, ISO 41001 and fire NOC and lift license requirements.

Standard site-level inspections for construction, safety, and compliance.

Complete work orders with checklist items, photos, and sign-off.

Inspect assets and equipment: condition, location, photos, and maintenance history.

Run the Maintenance Checklist on the InspectWrk app to capture photo evidence per finding and generate audit-ready reports.