EV Infrastructure Readiness Checklist

Use this ev infrastructure readiness checklist to work through existing infrastructure and location, electrical capacity, wiring and charger locations, network and safety, permitting and expansion, and gaps and recommended actions, logging issues with photos and notes and assigning corrective actions before sign-off.

6 sections14 questions12 to 23 minutesFree

EV Infrastructure ReadinessTower A · Electrical Capacity0 of 3 checked
  • Assess the electrical capacity available for EV charging.Facilities team reviewing site status in a plant control roomPhoto Added
  • Review panels and circuits for spare capacity.Facilities team reviewing site status in a plant control roomPhoto Added
  • Confirm available power and load considerations.Facilities team reviewing site status in a plant control roomPhoto Added
Free on iOS and AndroidGet the App

What’s in this checklist.

6 sections · 14 questions · 12 to 23 minutes · Free

    1. Record any existing EV charging infrastructure on site.

    2. Assess the parking and location options for chargers.

    1. Assess the electrical capacity available for EV charging.

    2. Review panels and circuits for spare capacity.

    3. Confirm available power and load considerations.

    1. Assess wiring and conduit pathways to the proposed charger locations.

    2. Confirm charger locations and accessibility.

    1. Assess network and connectivity considerations for the chargers.

    2. Confirm safety requirements for the installation area.

    1. Confirm permitting and documentation requirements.

    2. Assess expansion readiness for future chargers.

    1. Record infrastructure gaps that block deployment.

    2. Recommend corrective actions with an owner and priority.

    3. Record the readiness assessment.

How the EV Infrastructure Readiness checklist works.

Three steps, about 12 to 23 minutes.

  1. Work through each section

    Section by section, one check at a time.

  2. Log every finding

    Tap Fail, add a photo, assign who fixes it.

  3. Sign off and share

    The report is ready the moment you finish.

Same checklist, two ways to run it.

Paper for a one-off check. The app when every finding needs fixing.

Printed PDF

  • Pen on paper
  • Photos in your camera roll
  • Report typed up later

InspectWrk appRecommended

  • Photos on every finding
  • Owner and due date per finding
  • Report ready at sign-off
Get the App

Branded checklist

Get Your Company Branded Checklist

Customize with your logo and company details.

We respect your privacy. No spam, ever.

What is an ev infrastructure readiness checklist?

Quick answer

An ev infrastructure readiness checklist is the structured inspection used to confirm the infrastructure readiness remains serviceable, covering existing infrastructure and location, electrical capacity, wiring and charger locations, network and safety, permitting and expansion, and gaps and recommended actions that facilities management teams use to check the key inspection points, assign owners to any failures, and close them with photo proof. Completed in InspectWrk, it is timestamped, works offline, and exports as an audit-ready facilities management report for OSHA, ISO 41001 and fire NOC and lift license requirements.

An ev infrastructure readiness checklist is the structured inspection used to confirm the infrastructure readiness remains serviceable, covering existing infrastructure and location, electrical capacity, wiring and charger locations, network and safety, permitting and expansion, and gaps and recommended actions that facilities management teams use to check existing infrastructure and location, electrical capacity, wiring and charger locations, network and safety, permitting and expansion, and gaps and recommended actions, capture photo evidence, and track corrective actions to closure. Its job is to confirm the infrastructure readiness remains serviceable, covering existing infrastructure and location, electrical capacity, wiring and charger locations, network and safety, permitting and expansion, and gaps and recommended actions.

Why are ev infrastructure readiness inspections still chased on WhatsApp?

Centre managers, Facility managers and AFM and CE teams still miss unresolved infrastructure readiness defects and repeat findings when rounds are ticked without permits to work.

Without permits to work, teams reconstruct the evidence from phones instead of proving OSHA, ISO 41001 and fire NOC and lift license requirements readiness.

Before and After InspectWrk

Before InspectWrk

  • Centre managers send daily round photos on WhatsApp at the end of the shift.
  • Infrastructure readiness checks are ticked on paper without photo evidence per finding.
  • Missed PPM and AMC expiry surface when a client complaint lands, not when they happened.

After InspectWrk

  • Centre managers complete the inspection in the app with photo evidence at the ev infrastructure readiness, even offline.
  • Managers see open findings, closure status, and OSHA, ISO 41001 and fire NOC and lift license requirements evidence live on one dashboard.
  • Overdue PPM, AMC expiry, and missed checks escalate automatically before the client or auditor notices.

Why is an ev infrastructure readiness checklist important?

It helps centre managers and supervisors keep facilities management work consistent, safe, and auditable, with the evidence needed for OSHA, ISO 41001 and fire NOC and lift license requirements:

  • Cover the full inspection: structured checks across existing infrastructure and location, electrical capacity, wiring and charger locations, and network and safety surface unresolved infrastructure readiness defects and repeat findings before they reach handover, audit, or the next shift.
  • Document facilities management findings with the right proof: capture permits to work on every issue so nothing rests on memory.
  • Track facilities management fixes to closure: each failure becomes an action with an owner, a due date, and a re-inspection that confirms it is done.
  • Stay audit-ready: keep one timestamped record for OSHA, ISO 41001 and fire NOC and lift license requirements you can export instead of rebuilding it from scattered photos and spreadsheets.

What should be included in an ev infrastructure readiness checklist?

A complete ev infrastructure readiness checklist works through existing infrastructure and location, electrical capacity, wiring and charger locations, network and safety, permitting and expansion, and gaps and recommended actions, then records inspection context, scored checkpoints, and evidence with corrective actions:

Inspection context

Record where and when the inspection runs:

  • Site, facilities management location, and asset identification
  • Inspector, date, and the facilities management areas or assets in scope
  • Reference numbers or schedules linked to the checklist

Checkpoints and scoring

Define what each checkpoint verifies and how results are scored:

  • Existing Infrastructure & Location
  • Electrical Capacity
  • Wiring & Charger Locations
  • Network & Safety
  • Permitting & Expansion
  • Gaps & Recommended Actions
  • 15 fields aligned to the checklist

Evidence and corrective actions

Make every finding traceable and actionable:

  • Capture permits to work on failed or critical items
  • Retain permits to work with the inspection record
  • Sign-off, completion status, and follow-up notes

How do teams use an ev infrastructure readiness checklist?

Follow these steps to run the ev infrastructure readiness checklist:

  1. Fill in the ev infrastructure readiness header: inspector, site, date, and areas in scope.
  2. Work through existing infrastructure and location, electrical capacity, wiring and charger locations, network and safety, permitting and expansion, and gaps and recommended actions in order, recording pass, fail, or N/A.
  3. Attach permits to work wherever a failure or observation needs proof.
  4. Raise actions for unresolved infrastructure readiness defects and repeat findings with owners and deadlines before sign-off.
  5. Review the ev infrastructure readiness summary, share the report, and keep the record for your audit trail.

See how this checklist fits into Facility management software.

This checklist runs as a mobile inspection app that works fully offline on site, with AI-powered defect detection on every photo. To see it on your own workflows, talk to our team.

AI-Powered Features for Your Field Workflows

Submit an inspection and AI writes the PDF report and Excel sheet for you. No admin, no waiting.

01 / 05Photo to formVISION AI

Take a Photo. AI Fills the Form.

Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.

No typing. No manual entry.

02 / 05Voice to textVOICE AI

Speak. AI Writes It Down.

Inspectors speak their observations in any language. AI transcribes and fills the form in real time.

Completely hands-free in the field.

03 / 05Auto reportsREPORT AI

AI Writes the Report. PDF and Excel, Instantly.

The moment an inspection is submitted, AI summarises the findings and builds a branded PDF report and an Excel sheet for you.

No manual reporting. No copy-paste.

04 / 05IntegrationsINTEGRATIONS

Connect Your Existing Tools.

InspectWrk integrates with the tools your team already uses, including Zoho, Microsoft 365, and SAP.

No double entry.

05 / 05Live dashboardLIVE DATA

Live Dashboard. Every Site. Always On.

Your operations team sees completion rates, open issues, and compliance scores across all sites in real time.

No chasing updates.

One Platform. Mobile-First. AI-Powered.

  • Collaborate

    Collaborate with your team anytime, anywhere

    See which checklists your team has in progress across every site, jump into the same inspection with one tap, and keep field, supervisor, and back-office views in sync without sending screenshots on WhatsApp.

    • Organise inspection data by site, team, and date
    • Assign checks to the inspector or vendor responsible
    • Track completion across every location in one view
    • Keep field and back-office in sync in real time
    • Comment on findings without leaving the inspection
  • Custom Reports

    Custom reports that guide your decision making

    Every team reports differently. Build the report your operations, quality, or compliance leads actually want to read, share it as a branded PDF, and schedule delivery to the stakeholders who need it.

    • Branded PDF and CSV export from any completed inspection
    • Schedule weekly or monthly delivery to managers and clients
    • Share to email, Drive, Teams, or Slack in one click
    • Filter findings by site, severity, or corrective-action status
  • Powerful Analytics

    Analyse your inspection data with confidence

    See completion, pass rate, and recurring findings across every checklist and every site, without pulling spreadsheets together at the end of the month.

    Powerful dashboard
    Combine multiple reports into one dashboard so you can monitor status, bottlenecks, and completion trends at a glance.
    Always in sync
    Changes sync across devices so inspectors, supervisors, and back-office teams always see the latest responses and attachments.
    Embedded analytics
    Explore checklist data with charts and breakdowns that stay tied to the underlying inspections, without exporting to spreadsheets.

EV Infrastructure Readinessquestions

See this checklist running on your own sites in a 30-minute demo.

Book a Free Demo

It is scoped to the scheduled cadence and controls that centre managers, facility managers, AFM and CE teams, operations directors run, not a one-off handover walk. It prompts existing infrastructure and location, electrical capacity, wiring and charger locations, network and safety, permitting and expansion, and gaps and recommended actions, watching for unresolved infrastructure readiness defects and repeat findings, records pass, fail, or N/A with permits to work on critical items, and raises corrective actions with owners before sign-off. Run in InspectWrk, the record is timestamped and rolls into trend reports so repeat failures surface before the next audit.

They work through each checkpoint to confirm the infrastructure readiness remains serviceable, covering existing infrastructure and location, electrical capacity, wiring and charger locations, network and safety, permitting and expansion, and gaps and recommended actions, confirm the required controls are in place, and capture permits to work on anything that fails or needs proof. Priority failure modes include unresolved infrastructure readiness defects and repeat findings. Each checkpoint takes pass, fail, or N/A, and a failed item stays open until the fix is verified.

It expects permits to work, plus permits to work on failed or critical items, so findings rest on proof rather than memory. Records support OSHA, ISO 41001 and fire NOC and lift license requirements, and every photo, note, and sign-off stays attached to the inspection instead of living in chat threads.

The ev infrastructure readiness checklist covers existing infrastructure and location, electrical capacity, wiring and charger locations, network and safety, permitting and expansion, and gaps and recommended actions. On each checkpoint, centre managers record pass, fail, or N/A, add a photo on anything that needs proof, and raise a corrective action with an owner and due date. Run in InspectWrk, the inspection is timestamped, traceable to whoever completed it, and exports as a single facilities management report aligned to OSHA, ISO 41001 and fire NOC and lift license requirements.

More facilities management checklists.

  • Technician in red hard hat checking a wall mounted fire alarm panel beside red pipes
    Facilities27,400+ downloads

    Maintenance Checklist

    Run the Maintenance Checklist on the InspectWrk app to capture photo evidence per finding and generate audit-ready reports.

    • Maintenance
    • Repair
    Get Checklist: Maintenance Checklist