Take a Photo. AI Fills the Form.
Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.
No typing. No manual entry.
Use this make-up air unit inspection checklist to review unit condition, outside-air intake, filters, supply fan and belts, dampers and airflow, and heating section, recording pass, fail, or N/A and capturing a photo on anything that needs proof.
10 sections20 questions11 to 21 minutesFree
Photo Added
Photo Added
Photo Added10 sections · 20 questions · 11 to 21 minutes · Free
Record the make-up air unit asset tag, location, make, model, and serial number.
Inspect the cabinet, panels, and fasteners for corrosion, dents, and missing screws.
Confirm the outside-air intake, louvres, and bird screen are clear and undamaged.
Check the intake is free of obstruction and recirculation.
Confirm the correct filters are fitted, seated, and within their service life.
Record filter differential pressure against the change-out threshold.
Check supply fan bearings for noise, play, and vibration.
Inspect belts for wear, cracking, and correct tension, and confirm sheave alignment.
Confirm outside-air and relief dampers move freely through full travel and actuators drive fully.
Verify supply airflow and pressurisation meet the design set point.
Inspect the heating section, coil, or elements for damage and correct operation.
Confirm the heating stages and controls respond correctly.
Inspect the cooling coil for cleanliness, bent fins, and drainage where fitted.
Confirm cooling operates correctly where applicable.
Inspect the burner and heat exchanger for damage, soot, and cracks where fitted.
Confirm safe ignition, flame, and flue where a gas burner is present.
Inspect contactors, terminals, and control wiring for burning, pitting, and looseness.
Confirm controls, sensors, and safety interlocks operate correctly.
Confirm the condensate pan, drain, and trap are clear and draining.
Record abnormal noise or vibration, then raise a corrective action with owner and due date.
Three steps, about 11 to 21 minutes.
Section by section, one check at a time.
Tap Fail, add a photo, assign who fixes it.
The report is ready the moment you finish.
Paper for a one-off check. The app when every finding needs fixing.
Branded checklist
Customize with your logo and company details.
Quick answer
A make-up air unit inspection checklist is the structured inspection used to confirm HVAC plant delivers designed airflow, filtration, and refrigerant integrity that facilities management teams use to check the key inspection points, assign owners to any failures, and close them with photo proof. Completed in InspectWrk, it is timestamped, works offline, and exports as an audit-ready facilities management report for OSHA, ISO 41001 and fire NOC and lift license requirements.
A make-up air unit inspection checklist is the structured inspection used to confirm HVAC plant delivers designed airflow, filtration, and refrigerant integrity that facilities management teams use to check unit condition, outside-air intake, filters, supply fan and belts, dampers and airflow, and heating section, capture photo evidence, and track corrective actions to closure. Its job is to confirm HVAC plant delivers designed airflow, filtration, and refrigerant integrity. Inspect a make-up air unit (MAU): unit condition, outside-air intake, filters, supply fan, belts, dampers, airflow, heating section, cooling section, burner and heat exchanger, controls, electrical components, and drainage, with noise and vibration checks. It is sometimes called the Make Up Air Unit Inspection Checklist or the MAU Inspection Checklist.
HVAC engineers and FM engineering managers still miss blocked filters, fouled coils and refrigerant undercharge when rounds are ticked without filter photo, coil photo and gauge reading.
Without a single inspection record, teams reconstruct the evidence from phones instead of proving OSHA, ISO 41001 and fire NOC and lift license requirements readiness.
It helps centre managers and supervisors keep facilities management work consistent, safe, and auditable, with the evidence needed for OSHA, ISO 41001 and fire NOC and lift license requirements:
A complete make-up air unit inspection checklist works through unit condition, outside-air intake, filters, supply fan and belts, dampers and airflow, and heating section, then records inspection context, scored checkpoints, and evidence with corrective actions:
Record where and when the inspection runs:
Define what each checkpoint verifies and how results are scored:
Make every finding traceable and actionable:
Follow these steps to run the make-up air unit inspection checklist:
See how this checklist fits into Facility management software.
This checklist runs as a mobile inspection app that works fully offline on site, with AI-powered defect detection on every photo. To see it on your own workflows, talk to our team.
Submit an inspection and AI writes the PDF report and Excel sheet for you. No admin, no waiting.
Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.
No typing. No manual entry.
Inspectors speak their observations in any language. AI transcribes and fills the form in real time.
Completely hands-free in the field.
The moment an inspection is submitted, AI summarises the findings and builds a branded PDF report and an Excel sheet for you.
No manual reporting. No copy-paste.
InspectWrk integrates with the tools your team already uses, including Zoho, Microsoft 365, and SAP.
No double entry.
Your operations team sees completion rates, open issues, and compliance scores across all sites in real time.
No chasing updates.
See which checklists your team has in progress across every site, jump into the same inspection with one tap, and keep field, supervisor, and back-office views in sync without sending screenshots on WhatsApp.
Every team reports differently. Build the report your operations, quality, or compliance leads actually want to read, share it as a branded PDF, and schedule delivery to the stakeholders who need it.
See completion, pass rate, and recurring findings across every checklist and every site, without pulling spreadsheets together at the end of the month.
See this checklist running on your own sites in a 30-minute demo.
Book a Free DemoIt is scoped to the scheduled cadence and controls that centre managers, facility managers, AFM and CE teams, operations directors run, not a one-off handover walk. It prompts unit condition, outside-air intake, filters, supply fan and belts, dampers and airflow, and heating section, watching for blocked filters, fouled coils and refrigerant undercharge, records pass, fail, or N/A with filter photo, coil photo and gauge reading on critical items, and raises corrective actions with owners before sign-off. Run in InspectWrk, the record is timestamped and rolls into trend reports so repeat failures surface before the next audit.
They work through each checkpoint to confirm HVAC plant delivers designed airflow, filtration, and refrigerant integrity, confirm the required controls are in place, and capture filter photo, coil photo and gauge reading on anything that fails or needs proof. Priority failure modes include blocked filters, fouled coils and refrigerant undercharge. Each checkpoint takes pass, fail, or N/A, and a failed item stays open until the fix is verified.
It expects filter photo, coil photo and gauge reading on failed or critical items, so findings rest on proof rather than memory. Records support OSHA, ISO 41001 and fire NOC and lift license requirements, and every photo, note, and sign-off stays attached to the inspection instead of living in chat threads.
The make-up air unit inspection checklist covers unit condition, outside-air intake, filters, supply fan and belts, dampers and airflow, and heating section. On each checkpoint, centre managers record pass, fail, or N/A, add a photo on anything that needs proof, and raise a corrective action with an owner and due date. Run in InspectWrk, the inspection is timestamped, traceable to whoever completed it, and exports as a single facilities management report aligned to OSHA, ISO 41001 and fire NOC and lift license requirements.

Standard site-level inspections for construction, safety, and compliance.

Complete work orders with checklist items, photos, and sign-off.

Inspect assets and equipment: condition, location, photos, and maintenance history.

Run the Maintenance Checklist on the InspectWrk app to capture photo evidence per finding and generate audit-ready reports.