InspectWrk

Rooftop Unit (RTU) Inspection Checklist

Use this rooftop unit (rtu) inspection checklist to review unit identification and condition, air filters, coils, fans, motors and belts, electrical components, and drainage, recording pass, fail, or N/A and capturing a photo on anything that needs proof.

9 sections27 questions11 to 21 minutesFree

Rooftop Unit (RTU) InspectionTower A · Unit Identification & Condition0 of 3 checked
  • Record the rooftop unit asset tag, location, make, model, and serial number.Facilities team reviewing site status in a plant control roomPhoto Added
  • Confirm the RTU matches the asset register and its preventive-maintenance schedule.Facilities team reviewing site status in a plant control roomPhoto Added
  • Check the cabinet, access panels, and fasteners for corrosion, dents, and missing screws.Facilities team reviewing site status in a plant control roomPhoto Added
Free on iOS and AndroidGet the App

What’s in this checklist.

9 sections · 27 questions · 11 to 21 minutes · Free

    1. Record the rooftop unit asset tag, location, make, model, and serial number.

    2. Confirm the RTU matches the asset register and its preventive-maintenance schedule.

    3. Check the cabinet, access panels, and fasteners for corrosion, dents, and missing screws.

    1. Confirm the correct filter size and MERV rating are fitted and seated with no bypass.

    2. Record filter differential pressure and compare it to the change-out threshold.

    3. Replace filters that are loaded, damaged, or past their service interval.

    1. Inspect evaporator and condenser coils for dirt, bent fins, and corrosion.

    2. Confirm coils are cleaned and fins combed where restricted.

    3. Check for oily residue that indicates a refrigerant leak.

    1. Check supply and condenser fan bearings for noise, play, and vibration.

    2. Inspect belts for wear, cracking, glazing, and correct tension.

    3. Record motor running amperage against nameplate full-load amps.

    1. Inspect contactors, capacitors, and terminals for burning, pitting, or looseness.

    2. Confirm disconnect, fuse, and breaker ratings are correct and secure.

    3. Verify low-voltage control wiring connections are tight.

    1. Check the condensate pan for standing water, rust, and blockage.

    2. Confirm the drain line and trap are clear and draining freely.

    3. Verify the condensate float switch operates.

    1. Inspect supply and return duct connections for leaks and loose seals.

    2. Check outside-air and economizer dampers move freely through full travel.

    3. Confirm damper actuators drive fully open and closed.

    1. Verify the thermostat setpoint and confirm the unit responds to heating and cooling calls.

    2. Check the control board for fault codes and out-of-range sensor readings.

    3. Confirm safety and limit controls function.

    1. Record any refrigerant, water, or gas leaks and physical damage found.

    2. Capture a photo of every failed item as evidence.

    3. Raise a corrective action with an owner and due date for each deficiency.

How the Rooftop Unit (RTU) Inspection checklist works.

Three steps, about 11 to 21 minutes.

  1. Work through each section

    Section by section, one check at a time.

  2. Log every finding

    Tap Fail, add a photo, assign who fixes it.

  3. Sign off and share

    The report is ready the moment you finish.

Same checklist, two ways to run it.

Paper for a one-off check. The app when every finding needs fixing.

Printed PDF

  • Pen on paper
  • Photos in your camera roll
  • Report typed up later

InspectWrk appRecommended

  • Photos on every finding
  • Owner and due date per finding
  • Report ready at sign-off
Get the App

Branded checklist

Get Your Company Branded Checklist

Customize with your logo and company details.

We respect your privacy. No spam, ever.

What is a rooftop unit (rtu) inspection checklist?

Quick answer

A rooftop unit (rtu) inspection checklist is the structured inspection used to confirm HVAC plant delivers designed airflow, filtration, and refrigerant integrity that facilities management teams use to check the key inspection points, assign owners to any failures, and close them with photo proof. Completed in InspectWrk, it is timestamped, works offline, and exports as an audit-ready facilities management report for OSHA, ISO 41001 and fire NOC and lift license requirements.

A rooftop unit (rtu) inspection checklist is the structured inspection used to confirm HVAC plant delivers designed airflow, filtration, and refrigerant integrity that facilities management teams use to check unit identification and condition, air filters, coils, fans, motors and belts, electrical components, and drainage, capture photo evidence, and track corrective actions to closure. Its job is to confirm HVAC plant delivers designed airflow, filtration, and refrigerant integrity. Inspect rooftop HVAC units end to end: filters, coils, belts, fans, motors, electrical connections, drainage, and thermostat operation, with photo evidence and corrective actions. It is sometimes called the RTU Inspection Checklist or the Rooftop HVAC Inspection Checklist.

Why are rooftop unit (rtu) inspections still chased on WhatsApp?

HVAC engineers and FM engineering managers still miss blocked filters, fouled coils and refrigerant undercharge when rounds are ticked without filter photo, coil photo and gauge reading.

Without a single inspection record, teams reconstruct the evidence from phones instead of proving OSHA, ISO 41001 and fire NOC and lift license requirements readiness.

Before and After InspectWrk

Before InspectWrk

  • Centre managers send daily round photos on WhatsApp at the end of the shift.
  • Rooftop unit rtu checks are ticked on paper without photo evidence per finding.
  • Missed PPM and AMC expiry surface when a client complaint lands, not when they happened.

After InspectWrk

  • Centre managers complete the inspection in the app with photo evidence at the rooftop unit (rtu), even offline.
  • Managers see open findings, closure status, and OSHA, ISO 41001 and fire NOC and lift license requirements evidence live on one dashboard.
  • Overdue PPM, AMC expiry, and missed checks escalate automatically before the client or auditor notices.

Why is a rooftop unit (rtu) inspection checklist important?

It helps centre managers and supervisors keep facilities management work consistent, safe, and auditable, with the evidence needed for OSHA, ISO 41001 and fire NOC and lift license requirements:

  • Cover the full inspection: structured checks across unit identification and condition, air filters, coils, and fans, motors and belts surface blocked filters, fouled coils and refrigerant undercharge before they reach handover, audit, or the next shift.
  • Document facilities management findings with the right proof: capture filter photo, coil photo and gauge reading on every issue so nothing rests on memory.
  • Track facilities management fixes to closure: each failure becomes an action with an owner, a due date, and a re-inspection that confirms it is done.
  • Stay audit-ready: keep one timestamped record for OSHA, ISO 41001 and fire NOC and lift license requirements you can export instead of rebuilding it from scattered photos and spreadsheets.

What should be included in a rooftop unit (rtu) inspection checklist?

A complete rooftop unit (rtu) inspection checklist works through unit identification and condition, air filters, coils, fans, motors and belts, electrical components, and drainage, then records inspection context, scored checkpoints, and evidence with corrective actions:

Inspection context

Record where and when the inspection runs:

  • Site, facilities management location, and asset identification
  • Inspector, date, and the facilities management areas or assets in scope
  • Reference numbers or schedules linked to the checklist

Checkpoints and scoring

Define what each checkpoint verifies and how results are scored:

  • Unit Identification & Condition
  • Air Filters
  • Coils
  • Fans, Motors & Belts
  • Electrical Components
  • Drainage
  • 14 fields aligned to the checklist

Evidence and corrective actions

Make every finding traceable and actionable:

  • Capture filter photo, coil photo and gauge reading on failed or critical items
  • Corrective actions with owners and due dates for facilities management teams
  • Sign-off, completion status, and follow-up notes

How do teams use a rooftop unit (rtu) inspection checklist?

Follow these steps to run the rooftop unit (rtu) inspection checklist:

  1. Fill in the rooftop unit (rtu) header: inspector, site, date, and areas in scope.
  2. Work through unit identification and condition, air filters, coils, fans, motors and belts, electrical components, and drainage in order, recording pass, fail, or N/A.
  3. Attach filter photo, coil photo and gauge reading wherever a failure or observation needs proof.
  4. Raise actions for blocked filters, fouled coils and refrigerant undercharge with owners and deadlines before sign-off.
  5. Review the rooftop unit (rtu) summary, share the report, and keep the record for your audit trail.

See how this checklist fits into Facility management software.

This checklist runs as a mobile inspection app that works fully offline on site, with AI-powered defect detection on every photo. To see it on your own workflows, talk to our team.

AI-Powered Features for Your Field Workflows

Submit an inspection and AI writes the PDF report and Excel sheet for you. No admin, no waiting.

01 / 05Photo to formVISION AI

Take a Photo. AI Fills the Form.

Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically.

No typing. No manual entry.

02 / 05Voice to textVOICE AI

Speak. AI Writes It Down.

Inspectors speak their observations in any language. AI transcribes and fills the form in real time.

Completely hands-free in the field.

03 / 05Auto reportsREPORT AI

AI Writes the Report. PDF and Excel, Instantly.

The moment an inspection is submitted, AI summarises the findings and builds a branded PDF report and an Excel sheet for you.

No manual reporting. No copy-paste.

04 / 05IntegrationsINTEGRATIONS

Connect Your Existing Tools.

InspectWrk integrates with the tools your team already uses, including Zoho, Microsoft 365, and SAP.

No double entry.

05 / 05Live dashboardLIVE DATA

Live Dashboard. Every Site. Always On.

Your operations team sees completion rates, open issues, and compliance scores across all sites in real time.

No chasing updates.

One Platform. Mobile-First. AI-Powered.

  • Collaborate

    Collaborate with your team anytime, anywhere

    See which checklists your team has in progress across every site, jump into the same inspection with one tap, and keep field, supervisor, and back-office views in sync without sending screenshots on WhatsApp.

    • Organise inspection data by site, team, and date
    • Assign checks to the inspector or vendor responsible
    • Track completion across every location in one view
    • Keep field and back-office in sync in real time
    • Comment on findings without leaving the inspection
  • Custom Reports

    Custom reports that guide your decision making

    Every team reports differently. Build the report your operations, quality, or compliance leads actually want to read, share it as a branded PDF, and schedule delivery to the stakeholders who need it.

    • Branded PDF and CSV export from any completed inspection
    • Schedule weekly or monthly delivery to managers and clients
    • Share to email, Drive, Teams, or Slack in one click
    • Filter findings by site, severity, or corrective-action status
  • Powerful Analytics

    Analyse your inspection data with confidence

    See completion, pass rate, and recurring findings across every checklist and every site, without pulling spreadsheets together at the end of the month.

    Powerful dashboard
    Combine multiple reports into one dashboard so you can monitor status, bottlenecks, and completion trends at a glance.
    Always in sync
    Changes sync across devices so inspectors, supervisors, and back-office teams always see the latest responses and attachments.
    Embedded analytics
    Explore checklist data with charts and breakdowns that stay tied to the underlying inspections, without exporting to spreadsheets.

Rooftop Unit (RTU) Inspectionquestions

See this checklist running on your own sites in a 30-minute demo.

Book a Free Demo

It is scoped to the scheduled cadence and controls that centre managers, facility managers, AFM and CE teams, operations directors run, not a one-off handover walk. It prompts unit identification and condition, air filters, coils, fans, motors and belts, electrical components, and drainage, watching for blocked filters, fouled coils and refrigerant undercharge, records pass, fail, or N/A with filter photo, coil photo and gauge reading on critical items, and raises corrective actions with owners before sign-off. Run in InspectWrk, the record is timestamped and rolls into trend reports so repeat failures surface before the next audit.

They work through each checkpoint to confirm HVAC plant delivers designed airflow, filtration, and refrigerant integrity, confirm the required controls are in place, and capture filter photo, coil photo and gauge reading on anything that fails or needs proof. Priority failure modes include blocked filters, fouled coils and refrigerant undercharge. Each checkpoint takes pass, fail, or N/A, and a failed item stays open until the fix is verified.

It expects filter photo, coil photo and gauge reading on failed or critical items, so findings rest on proof rather than memory. Records support OSHA, ISO 41001 and fire NOC and lift license requirements, and every photo, note, and sign-off stays attached to the inspection instead of living in chat threads.

The rooftop unit (rtu) inspection checklist covers unit identification and condition, air filters, coils, fans, motors and belts, electrical components, and drainage. On each checkpoint, centre managers record pass, fail, or N/A, add a photo on anything that needs proof, and raise a corrective action with an owner and due date. Run in InspectWrk, the inspection is timestamped, traceable to whoever completed it, and exports as a single facilities management report aligned to OSHA, ISO 41001 and fire NOC and lift license requirements.

More facilities management checklists.

  • Technician in red hard hat checking a wall mounted fire alarm panel beside red pipes
    Facilities27,400+ downloads

    Maintenance Checklist

    Run the Maintenance Checklist on the InspectWrk app to capture photo evidence per finding and generate audit-ready reports.

    • Maintenance
    • Repair
    Get Checklist: Maintenance Checklist